Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T01CM05080
Permit Details
Apply Date:
10/11/2001
Applicant:
FIRST WORTHINGTON
Description:
NEW:APARTMENT BUILDING A
Contractors:
- T A-WALLICK LLC
Permit Reviews
Permit Number - T01CM05080
Permit Status: Final
Permit Description: NEW:APARTMENT BUILDING A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/11/2001 | OTHER | 10/12/2001 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T01CM05080
Permit Description: NEW:APARTMENT BUILDING A
Total Completed Inspections - 43
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2001 | ELECTRIC - UNDERGROUND | RMAJUTA | Approved | OK TEMP CABLE 3/0 XHHW IN TRENCH O 1" PVC UNDER DATA ROOM AND BUILDING TO BUILDING. |
| 11/16/2001 | ELECTRIC - UFER | RMAJUTA | Approved | IVRS - Inspection 0000* |
| 11/19/2001 | BUILDING PRE-SLAB | EMONAHAN | Approved | IVRS - Inspection 0000* |
| 11/19/2001 | EXCAVATION/LAYOUT REBAR & ZON | EMONAHAN | Approved | IVRS - Inspection 0000* |
| 11/20/2001 | PLUMBING - ROUGH, SOIL | JSTANLEY | Approved | IVRS - Inspection 0000*PRE SLAB OK TEST ON 2" COPPER SERVICE OK. |
| 01/29/2002 | PLUMBING - SEWER HCS CONNECT | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 02/15/2002 | PLUMBING - PROGRESS | JSTANLEY | Approved | FROM PUBLIC SERVICE M-H #91. TO M-H#34 6" OK TO BACKFILL SUBJECT TO VARIFICATION OF GRADE WILL TEST AT LATER DATE. |
| 02/15/2002 | PLUMBING - ABOVE CEILING | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 02/15/2002 | PLUMBING - INTERMEDIATE | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 02/27/2002 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | |
| 02/27/2002 | BUILDING ABOVE CEILING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 02/27/2002 | FRAMING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 02/28/2002 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection 0000* |
| 03/04/2002 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection 0000*OK ROUGH ELECTRIC. |
| 03/07/2002 | U VALUE FOR WINDOW | AMATHIES | Approved | IVRS - Inspection 0000* |
| 03/07/2002 | STUCCO MESH | AMATHIES | Approved | IVRS - Inspection 0000* |
| 03/11/2002 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 04/15/2002 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection 0000*OK CABLE DROP ONLY. |
| 04/26/2002 | PLUMBING - GAS PRESSURE TEST | JSTANLEY | Approved | IVRS - Inspection 0000$ |
| 04/30/2002 | PLUMBING - FINAL | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 04/30/2002 | PLUMBING - YARD WTR LINE/TEST | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 05/09/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* BLDG. #14. |
| 05/21/2002 | PLUMBING - TEMP POWER FOR TEST | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 05/21/2002 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 05/21/2002 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved | IVRS - Inspection 0000* |
| 05/21/2002 | ROOF NAILING | AMATHIES | Approved | |
| 05/21/2002 | EXT METAL CLIPS/EXT SHEATHING | AMATHIES | Approved | |
| 05/22/2002 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 05/28/2002 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | IVRS - Inspection 0000*1.) PLEASE LABEL OWNERS PANEL AND BREAKERS 2.) TIGHTEN LOOSE PHOTO CELLS 3.) DEVICE FOR WASHER NEED TO BE INSTALLED TO PROVIDE CLEARANCE AS DISCUSSED. 4.) WE HAVE A BACK TO BACK LIGHT FIXTURES STUBS IN FIREWALL 5.) PLEASE LABEL BREAKERS #1420. ROOF OK OK TEMP POWER FOR TEST. |
| 05/29/2002 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection 0000*OK FINAL SUBJECT TO OTHER INSPECTIONS. |
| 06/14/2002 | SIGN - FINAL | JYBARRA | Approved | |
| 06/17/2002 | NPPO - FINAL | PGILBERT | Approved | OK FOR TEMP C OF O. AT TIME OF FINAL, ALL CONSTRUCTION DEBRIS SHALL BE REMOVED FROM PARKING LOT. |
| 06/20/2002 | FIRE - FINAL | LLAKEY | Approved | |
| 06/20/2002 | FIRE - ALARM FINAL | LLAKEY | Approved | |
| 06/20/2002 | FIRE SPKLR - FINAL | LLAKEY | Approved | |
| 06/20/2002 | FIRE SPKLR - OH PIPING & HYDRO | LLAKEY | Approved | |
| 06/20/2002 | FIRE SPKLR - UG PIPING FLUSH | LLAKEY | Approved | |
| 06/20/2002 | FIRE SPKLR - UG, PIPING, HYDRO | LLAKEY | Approved | |
| 07/24/2002 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | |
| 08/07/2002 | ENGINEERING - FINAL | DROBERTS | Approved | |
| 08/09/2002 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | |
| 11/21/2002 | LANDSCAPE - FINAL | PGILBERT | Approved | 1. Per LUC 3.7.2.7 all disturbed, grubbed, graded, or bladed areas not otherwise improved shall be landscaped, reseeded, or treated with an inorganic or organic ground cover to help reduce dust pollution. Currently at the southern side of building 14 there is a large area that does not have groundtreatment. Please treat the bare ground areas. |
| 08/01/2003 | PERMIT FINALED | AMATHIES | Approved |