Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
SINGLE FAMILY NEW
Address:
5173 S ZENITH WY
Apply Date:
08/28/2001
Applicant:
CONTRAVEST PROPERTIES
Description:
SFR:TD#15-18-24
Contractors:
  • CONTRAVEST PROPERTIES

Permit Reviews

Permit Number - T01CM04236
Permit Status: Final
Permit Description: SFR:TD#15-18-24
Start Date Submittal Complete Date Status  
08/28/2001 RESIDENTIAL BLDG/ZONING/FLOOD 08/29/2001 COMPLETED Review Details

Completed Inspections

Permit Status: Final
Permit Number: T01CM04236
Permit Description: SFR:TD#15-18-24
Total Completed Inspections - 23
Date Description Inspector Results Comments
11/20/2001 PLUMBING - SEWER HCS CONNECT BSTEVENS Approved IVRS - Inspection 0000*
11/20/2001 PLUMBING - YARD WTR LINE/TEST BSTEVENS Approved IVRS - Inspection 0000*
11/20/2001 PLUMBING - ROUGH, SOIL BSTEVENS Approved IVRS - Inspection 0000*
11/28/2001 ELECTRIC - UFER BSTEVENS Approved IVRS - Inspection 0000*
11/28/2001 BUILDING PRE-SLAB BSTEVENS Approved IVRS - Inspection 0000*
11/28/2001 EXCAVATION/LAYOUT REBAR & ZON BSTEVENS Approved IVRS - Inspection 0000*
12/06/2001 ELECTRIC - TEMPORARY SERVICE BSTEVENS Approved IVRS - Inspection 0000*
12/06/2001 ELECTRIC - CABLE DROP BSTEVENS Approved IVRS - Inspection 0000*
02/15/2002 ROOF NAILING BSTEVENS Approved IVRS - Inspection 0000*
02/15/2002 EXT METAL CLIPS/EXT SHEATHING BSTEVENS Approved IVRS - Inspection 0000*
04/16/2002 MECHANICAL - INTERMEDIATE BSTEVENS Approved IVRS - Inspection 0000*
04/16/2002 PLUMBING - GAS PRESSURE TEST BSTEVENS Approved IVRS - Inspection 0000*
04/16/2002 PLUMBING - INTERMEDIATE BSTEVENS Approved IVRS - Inspection 0000*
04/16/2002 ELECTRIC - INTERMEDIATE BSTEVENS Approved IVRS - Inspection 0000*
04/16/2002 FRAMING BSTEVENS Approved IVRS - Inspection 0000*
05/02/2002 SHEET ROCK NAILING BSTEVENS Approved IVRS - Inspection 0000*
05/02/2002 SHEET ROCK NAILING DQUINN Approved IVRS - Inspection 0999*/ 1) CLIP SHEET ROCK OR INSTALL NAILER AT SOUTHEAST CORNER OF GARAGE BATHROOM 2) CORRECT BOWED STUD/OUTLET AT SOUTHWEST CORNER OF GARAGE KITCHEN 3) CORRECT INSTALLATION OF 3 SWITCH BOX ON SOUTH WALL OF GARAGE KITCHEN
MAIN HOUSE: 1) IF UPSTAIRS TUB SURROUND IS TO BE TILE, ADD NAILER IN NORTH EAST CORNER 2) IF MASTER SHOWER IS TO BE TILE, ADD NAILERS TO BOTH NORTH CORNERS
05/31/2002 STUCCO MESH BSTEVENS Approved IVRS - Inspection 0000*
07/12/2002 PERMIT FINALED BSTEVENS Approved
07/12/2002 MECHANICAL - FINAL BSTEVENS Approved IVRS - Inspection 0000*
07/12/2002 PLUMBING - FINAL BSTEVENS Approved IVRS - Inspection 0000*
07/12/2002 ELECTRIC - FINAL BSTEVENS Approved IVRS - Inspection 0000*
07/12/2002 BUILDING - FINAL BSTEVENS Approved IVRS - Inspection 0000*

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW