Permit: T01CM00641
Permit Details
Apply Date:
02/08/2001
Applicant:
ED MARONEY
Description:
REMODEL & ADDN:DINNING RM, KITHCHEN, BATHRM, BEDRM
Permit Reviews
Permit Number - T01CM00641
Permit Status: Closed
Permit Description: REMODEL & ADDN:DINNING RM, KITHCHEN, BATHRM, BEDRM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/08/2001 | RESIDENTIAL BLDG/ZONING/FLOOD/WWM | 05/11/2001 | COMPLETED |
| 05/11/2001 | RESUBMITTAL | 05/18/2001 | COMPLETED |
| 07/20/2001 | REVISION | 07/20/2001 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T01CM00641
Permit Status: Closed
Permit Description: REMODEL & ADDN:DINNING RM, KITHCHEN, BATHRM, BEDRM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/08/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Closed
Permit Number: T01CM00641
Permite Description: REMODEL & ADDN:DINNING RM, KITHCHEN, BATHRM, BEDRM
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| EXCAVATION/LAYOUT REBAR & ZON | N/A | Not Inspected |
Completed Inspections
Permit Status: Closed
Permit Number: T01CM00641
Permit Description: REMODEL & ADDN:DINNING RM, KITHCHEN, BATHRM, BEDRM
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2001 | PLUMBING - SEWER HCS CONNECT | RFREIDIN | Approved | |
| 08/02/2001 | PLUMBING - YARD WTR LINE/TEST | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 08/02/2001 | PLUMBING - ROUGH, SOIL | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 08/20/2001 | BUILDING PRE-SLAB | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 10/03/2001 | ELECTRIC - CABLE DROP | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 11/07/2001 | ROOF NAILING | RFREIDIN | Approved | IVRS - Inspection 0000*/ 1) ELEVATION PAGE HAS A 15'-9" + - HT. FOR END WALL 2) NO PITCH NOTED ON PLANS EXCEPT ENGINEERING FOR PANEL ROOF SYSTEM 3) FROM NATURAL GRADE TO RIDGE HT. THE INSTALLED HT. AT PRESENT IS 17'-3", ON PLAN SIDE YARD SET BACK IS 11'-1" 4) HAVE PLAN CHECK, OR ZONING APPROVE YOUR SITUATION |
| 02/20/2002 | EXT METAL CLIPS/EXT SHEATHING | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 03/12/2002 | STUCCO MESH | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 03/12/2002 | FRAMING | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 06/20/2002 | SHEET ROCK NAILING | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 12/10/2002 | MECHANICAL - FINAL | DQUINN | Approved | IVRS - Inspection 0000* |
| 07/02/2003 | ELECTRIC - FINAL | DQUINN | Approved | IVRS - Inspection 0000* |
| 07/16/2003 | PLUMBING - FINAL | DQUINN | Approved | IVRS - Inspection 0000* |
| 12/22/2008 | BUILDING - FINAL | LHANLY | Approved | |
| 12/22/2008 | MECHANICAL - INTERMEDIATE | LHANLY | Approved | FINALED BY DQUINN IN 12/2002 |
| 12/22/2008 | MECHANICAL - UNDERGROUND | LHANLY | Approved | FINALED BY DQUINN IN 12/2002 |
| 12/22/2008 | ELECTRIC - UFER | LHANLY | Approved | |
| 12/22/2008 | ELECTRIC - INTERMEDIATE | LHANLY | Approved | FINALED BY DQUINN ON 7-2-2003 |
| 12/22/2008 | PLUMBING - INTERMEDIATE | LHANLY | Approved | FINALED BY DQUINN ON 7/16/2003 |