Permit: T00CM05729
Permit Details
Apply Date:
11/27/2000
Applicant:
N/A
Description:
NEW:SHELL BUILDING
Contractors:
- CANBERRA CONSTRUCTION COMPANY L L C
Permit Reviews
Permit Number - T00CM05729
Permit Status: Final
Permit Description: NEW:SHELL BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/09/2001 | RESUBMITTAL | 03/07/2002 | COMPLETED |
| 04/18/2002 | REVISION | 04/22/2002 | COMPLETED |
| 04/18/2002 | REVISION | 05/08/2002 | COMPLETED |
| 08/23/2002 | REVISION | 08/30/2002 | COMPLETED |
| 09/05/2002 | REVISION | 09/10/2002 | COMPLETED |
| 11/27/2000 | COMMERCIAL NEW | 03/09/2001 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T00CM05729
Permit Description: NEW:SHELL BUILDING
Total Completed Inspections - 28
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/23/2002 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection 0000*1. PLAN REVISED AND APPROVED HAVE ARCHETECT CHANGE 4" TO 6" ON PLAN 2.) OK TO COVER 3.) WATER TEST OK. |
| 05/09/2002 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection 0000*NOTE OK 3/0 UFER, REBAR IS GROUNDING ELECTRODE. |
| 05/09/2002 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection 0000* |
| 05/09/2002 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection 0000*1.) POST ADDRESS SO IT IS VISIBLE FROM STREET 2.) SOIL REPORT REVIEWED & ACCEPTED. |
| 07/19/2002 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection 0000* 1.) REVIEWED DOCUMENT COVERING REVISION #4 CHANGE ORDER #1. 2.) YARDWATER FROM METER, THROUGH RPPBP, TO BLDG. SHUT OFF VALVE OK. 3.)PRESSURE TEST OK 4.) OK TO COVER. |
| 08/13/2002 | ELECTRIC - TEMPORARY POLE | JORTA | Approved | |
| 08/13/2002 | ELECTRIC - CABLE DROP | JORTA | Approved | |
| 08/13/2002 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection 0000* |
| 08/13/2002 | ELECTRIC - UNDERGROUND | JORTA | Approved | |
| 08/30/2002 | ELECTRIC - FINAL | JORTA | Approved | IVRS - Inspection 0000* |
| 09/05/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000*APPROVED PLAN SHOWS EVAP. CLR. SCH. DELETED. |
| 09/05/2002 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | |
| 09/05/2002 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection 0000*1.) THIS INSPECTION IS FOR SHELL BLDG. AND SITE UTILITIES ONLY. 2.) DO NOT REPLACE "TEMPORARY" HOSE BIBB WITHOUT INSTALLING A VACUUM BREAKER ON THE BIBB. 3.) CORRECTIONS MADE OK OK FOR C OF O PENDING ANY OTHER INSPECTION. |
| 09/05/2002 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | |
| 09/13/2002 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection 0000*NO WINDOWS IN BUILDING. |
| 09/13/2002 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000*HIGHSTRENGH BOLTING INSPECTION DONE L1 KORY ENGINEERING PER STAMPED APPROVED SUBSTITUTE ENGINEER OF RECORD 7-18-02. |
| 09/13/2002 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection 0000* |
| 09/13/2002 | REINFORCED MASONRY PRE-GROUT | LHANLY | Approved | IVRS - Inspection 0000*PREGROUT NO MASONRY ON JOB. |
| 09/13/2002 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection 0000*STEM WALL APPROVED NO STEMS. |
| 09/25/2002 | PERMIT FINALED | LHANLY | Approved | |
| 09/25/2002 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000* |
| 09/25/2002 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection 0000* |
| 09/26/2002 | FIRE - FINAL | LTHOMAS | Approved | |
| 09/26/2002 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 09/26/2002 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 09/26/2002 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 09/26/2002 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 01/31/2003 | LANDSCAPE - FINAL | PGILBERT | Approved |