Permit: T00CM05277
Permit Details
Apply Date:
10/25/2000
Applicant:
INTEGRATED DESIGN & CONSTRUCTION
Description:
TRIPLEX
Architects:
- AMY, NORMAN ARTHUR
Permit Reviews
Permit Number - T00CM05277
Permit Status: Final
Permit Description: TRIPLEX
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/25/2000 | 3RD PARTY REVIEW-COMMERCIAL | 05/03/2001 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T00CM05277
Permit Status: Final
Permit Description: TRIPLEX
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/25/2000 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T00CM05277
Permit Description: TRIPLEX
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2001 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection 0000* OK TO BACKFILL TRENCH, BLDG DRAIN IS STUBBED OUT AT 2 WAY C O ONLY |
| 05/14/2001 | EXCAVATION/LAYOUT REBAR & ZON | EMONAHAN | Approved | IVRS - Inspection 0000* |
| 06/15/2001 | ROOF NAILING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 06/15/2001 | EXT METAL CLIPS/EXT SHEATHING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 07/18/2001 | STUCCO MESH | EMONAHAN | Approved | IVRS - Inspection 0000$INSTALL NAILS WHERE INDICATED THEN OK. |
| 07/18/2001 | FRAMING | EMONAHAN | Approved | IVRS - Inspection 0000* |
| 07/19/2001 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | IVRS - Inspection 0000*1.) WASTE & VENT SYSTEM IS OK 2.) OVERHEAD WATER DISTRIBUTION IS OK 3.) GAS PRESSURE TEST IS OK 4.) OK TO DRYWALL UPON BLDG. INSPECTOR APPROVAL. |
| 07/23/2001 | ELECTRIC - INTERMEDIATE | RMAJUTA | Approved | IVRS - Inspection 0000* |
| 07/25/2001 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 07/26/2001 | SHEET ROCK NAILING | EMONAHAN | Approved | IVRS - Inspection 0000* |
| 09/20/2001 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection 0000* |
| 10/22/2001 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection 0000*OK CABLE DROP TO UNITS 1,2,3. TO ALLOW BACKFILL OF TRENCH, NO POWER RELEASE YET, SEE OTHER WRITE UP. |
| 12/13/2001 | PLUMBING - TEMP POWER FOR TEST | TRINIVJR | Approved | IVRS - Inspection 0000*PLUMBING TEMP POWER OK FOR TEMP POWER. |
| 12/13/2001 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved | |
| 12/14/2001 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 12/17/2001 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 12/20/2001 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | |
| 12/20/2001 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection 0000*1.) PLBG FINAL IS OK 2.) OK FOR C OF O. |
| 12/21/2001 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection 0000*1.) PROTECT CONDUCT ENTERING BATH FIXTURE 2.) MAKEUP FIXTURE AS PER MANUFACTURE LISTING. 3.) PLEASE INSTALL CONDUCTORS UNDER SCREWS IN A CLOCKWISE DIRECTION. 4.) PLEASE OREINT DRYER RECEPTACLE SO AS TO PREVENT CORD FROM DISCONNECTING 5.) LOOSE SEALTITE FITTINGS FOR T-STAT WIRE. |
| 12/28/2001 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 01/07/2002 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection 0000* |
| 04/09/2003 | RIGHT OF WAY - FINAL | MOTERO | Approved | |
| 04/09/2003 | FIRE - FINAL | CSCHULTZ | Approved | |
| 06/20/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 10/25/2015 | ENGINEERING - FINAL | DROBERTS | Approved |