Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Withdrwn
Type:
COMMERCIAL NEW
Apply Date:
10/13/2000
Applicant:
METRO PERMIT EXPRESS, INC
Description:
SHELL BUILDING
Architects:
  • MORROW, KEVIN THOMAS

Permit Reviews

Permit Number - T00CM05120
Permit Status: Withdrwn
Permit Description: SHELL BUILDING
Start Date Submittal Complete Date Status  
10/13/2000 3RD PARTY REVIEW-COMMERCIAL 12/19/2000 COMPLETED Review Details
12/19/2000 REVISION 11/16/2001 STOPPED Review Details

Outstanding Activity Conditions

Permit Number - T00CM05120
Permit Status: Withdrwn
Permit Description: SHELL BUILDING
Total Outstanding Activity Conditions - 6
Date Name
10/13/2000 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/26/2000 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
10/26/2000 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
10/26/2000 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/26/2000 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/26/2000 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Withdrwn
Permit Number: T00CM05120
Permite Description: SHELL BUILDING
Total Outstanding Inspections - 25
Last Inspection Date Description Inspector Results Comments
EXCAVATION/LAYOUT REBAR & ZON N/A Not Inspected
STEM WALL/RETAINING WALL N/A Not Inspected
BUILDING PRE-SLAB N/A Not Inspected
ROOF NAILING N/A Not Inspected
FRAMING N/A Not Inspected
U VALUE FOR WINDOW N/A Not Inspected
BUILDING - FINAL N/A Not Inspected
ELECTRIC - UNDERGROUND N/A Not Inspected
PLUMBING - ROUGH, SOIL N/A Not Inspected
PLUMBING - INTERMEDIATE N/A Not Inspected
PLUMBING - YARD WTR LINE/TEST N/A Not Inspected
PLUMBING - GAS PRESSURE TEST N/A Not Inspected
PLUMBING - SEWER HCS CONNECT N/A Not Inspected
PLUMBING - FINAL N/A Not Inspected
MECHANICAL - INTERMEDIATE N/A Not Inspected
MECHANICAL - FINAL N/A Not Inspected
FIRE SPKLR - UG, PIPING, HYDRO N/A Not Inspected
FIRE SPKLR - UG PIPING FLUSH N/A Not Inspected
FIRE SPKLR - OH PIPING & HYDRO N/A Not Inspected
FIRE SPKLR - FINAL N/A Not Inspected
FIRE - FINAL N/A Not Inspected
ENGINEERING - FINAL N/A Not Inspected
LANDSCAPE - FINAL N/A Not Inspected
SIGN - FINAL N/A Not Inspected
NPPO - FINAL N/A Not Inspected