Permit: SP-NRP-0925-00398
Permit Details
Apply Date:
09/01/2025
Applicant:
Anely Lopez
Description:
*Complete - Added to Utility Clearance Report* - - TEP requires preclearance before reconnecting services - -
Completed Inspections
Permit Status: Complete
Permit Number: SP-NRP-0925-00398
Permit Description: *Complete - Added to Utility Clearance Report* - - TEP requires preclearance before reconnecting services - -
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | Reconnect Only: Electrical Clearance | Passed | Approved for electrical reconnection - RECN Clearance to TEP is required for service reconnection |