Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Simple
Apply Date:
01/14/2025
Applicant:
Joseph Breinholt
Description:
*Complete - Added to Utility Clearance Report* - - Power reconnect in a metal fabrication shop that has been closed down for two years - -

Completed Inspections

Permit Status: Complete
Permit Number: SP-NRP-0125-00019
Permit Description: *Complete - Added to Utility Clearance Report* - - Power reconnect in a metal fabrication shop that has been closed down for two years - -
Total Completed Inspections - 1
Date Description Inspector Results Comments
01/21/2025 Reconnect Only: Electrical Clearance Passed Approved for electrical reconnection - RECN Clearance to TEP is required for Building #20 (#169207120)