Description:
Grading - Las Nubes, Lot 10.

Permit Reviews

Permit Number - DP22-0216
Permit Status: Complete
Permit Description: Grading - Las Nubes, Lot 10.
Start Date Submittal Complete Date Status  
08/08/2022 DEV PKG - OK TO SUBMIT (GRADING ONLY) 08/18/2022 COMPLETED Review Details
08/18/2022 DEV PKG - OK TO SUBMIT 08/18/2022 COMPLETED Review Details
08/18/2022 GRADING 09/15/2022 COMPLETED Review Details
09/30/2022 GRADING 10/17/2022 ACTIVE Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/14/2022 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0216
Permite Description: Grading - Las Nubes, Lot 10.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/03/2023 SITE - SWPPP Correction Notice N/A Not Applicable
COT - FCON - Fire - Final N/A Not Ready No access to job site. Gate Knox switch not active.

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0216
Permit Description: Grading - Las Nubes, Lot 10.
Total Completed Inspections - 16
Date Description Inspector Results Comments
08/03/2023 COT - ENGR - Signage Final Passed
08/03/2023 SITE - Zoning Final Passed
08/03/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
08/03/2023 SITE - Stormwater Setup and Controls Passed stormwater set up and control inspection is to be requested at the beginning of the project. Stormwater controls are to remain in place throughout the project, and Stormwater follow up inspections shall be continuous throughout the project.
08/03/2023 SITE - Stormwater Follow-up Passed
08/03/2023 SITE Passed
08/03/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
08/03/2023 COT - ENGR - Stormwater Passed
08/03/2023 ENGR - Drainage Structures Passed
08/03/2023 COT - ENGR - Site - Assurance Release Passed
08/03/2023 ENGR Engineering Final Passed
08/03/2023 SITE - Stormwater Final Inspection Passed
08/03/2023 PDSD Engineering Division Pre-Construction SITE Passed Josh, please schedule preconstruction meeting at the start of each project rather than at the end of the project. Thank you.
08/03/2023 PDSD Site/Engineering Division - Landscaping Passed
08/03/2023 PDSD Site/Engineering Division - NPPO Passed
09/26/2023 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed

Documents

File Name Document Type  
APPROVED 2_GRADING PLAN FOR DP22-0216_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_GRADING PLAN FOR DP22-0216_V1.PDF DOCUMENTS VIEW
2_ONLINE SUBMITTAL PAGE, RECVD 09.23.22.PDF PLANS UNDER REVIEW VIEW
2_GRADING PLAN FOR DP22-0216.PDF PLANS UNDER REVIEW VIEW
1_ONLINE SUBMITTAL PAGE, 08.17.22.PDF PLANS UNDER REVIEW VIEW
1_DP22-0216 - GRADING PLAN FOR LOT 10 OF LAS NUBES, 08.17.22.PDF PLANS UNDER REVIEW VIEW
1_ONLINE PERMIT APPLICATION, RECVD 07.22.22.PDF PLANS UNDER REVIEW VIEW
1_GRADING PLAN APPLICATION.PDF PLANS UNDER REVIEW VIEW