Permit Details

Status:
Complete
Type:
Development Package
Address:
5201 S 12TH AV
Address NEW:
5201 S 12TH AV
Apply Date:
05/11/2022
Applicant:
Description:
Revision 2- Site/Grading/Floodplain - El Guero Canelo. Demolition of old restaurant building and construction of

Permit Reviews

Permit Number - DP22-0124
Permit Status: Complete
Permit Description: Revision 2- Site/Grading/Floodplain - El Guero Canelo. Demolition of old restaurant building and construction of
Start Date Submittal Complete Date Status  
05/11/2022 DEV PKG - OK TO SUBMIT 06/01/2022 COMPLETED Review Details
06/01/2022 DEV PKG 08/12/2022 COMPLETED Review Details
09/19/2024 DEVELOPMENT PACKAGE REVIEW v.1 09/24/2024 APPROVED Review Details
08/28/2023 DEVELOPMENT PACKAGE NEW v.2 08/31/2023 APPROVED Review Details
12/26/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 01/09/2025 APPROVED Review Details
04/24/2023 DEVELOPMENT PACKAGE REVIEW v.1 06/06/2023 REQUIRES RESUBMIT Review Details
07/11/2023 DEVELOPMENT PACKAGE NEW v.1 07/28/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0124
Permite Description: Revision 2- Site/Grading/Floodplain - El Guero Canelo. Demolition of old restaurant building and construction of
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/05/2025 SITE N/A Canceled
07/10/2025 Verify required native plant protection, relocation, removal is completed prior to activity on job site N/A Partial Pass Contractor needs to address the gutter on the north west corner of the building finish the landscaping per plan
10/21/2025 Consultation SITE N/A Partial Pass Discussed modifications to pedestrian circulation, grading, and water harvesting to ensure site meets required code after elevation and location errors were identified. Instructed contractors to call in a flat work inspection prior to pouring sidewalk and curbs, and a paving inspection for Friday to check AB prior to anticipated paving. Will leave as partial pass to allow rescheduling should further discussion be required.
10/24/2025 N/A Partial Pass Okay to pour parking area sidewalks.
11/22/2024 N/A Partial Pass
11/22/2024 For trash and recycling enclosures N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0124
Permit Description: Revision 2- Site/Grading/Floodplain - El Guero Canelo. Demolition of old restaurant building and construction of
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/31/2025 PDSD Engineering Division Pre-Construction SITE Passed Pre-con is being done late but still at a good time. A consultation inspection will be added to the inspection list for any future questions. Next inspection should be the final grade inspection, please have all compaction test results on hand for grade at asphalt, sidewalk, trash enclosure's.
10/31/2025 ENGR Paving Passed
10/31/2025 Passed
10/31/2025 Passed
10/31/2025 For trash and recycling enclosures Passed
11/03/2025 ENGR Engineering Final Passed
10/31/2025 LAND Landscape Appearance & Function Final Passed