Permit: DP22-0110
Permit Details
Status:
Complete
Type:
Development Package
Address:
3700 S MISSION RD
Address NEW:
3700 S MISSION RD
Apply Date:
04/25/2022
Applicant:
joe oneill
Description:
Site/Grading - Kennedy Park. Construction of 3 baseball fields, new restroom, walking paths, and ass
Permit Reviews
Permit Number - DP22-0110
Permit Status: Complete
Permit Description: Site/Grading - Kennedy Park. Construction of 3 baseball fields, new restroom, walking paths, and ass
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2022 | DEV PKG - OK TO SUBMIT | 05/12/2022 | COMPLETED |
| 05/12/2022 | DEV PKG | 07/27/2022 | COMPLETED |
| 02/02/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/11/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0110
Permite Description: Site/Grading - Kennedy Park. Construction of 3 baseball fields, new restroom, walking paths, and ass
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2024 | For trash and recycling enclosures | N/A | Not Ready | Height of wall should be 6' tall from top of slab. slab is good to pour. |
| 07/10/2025 | COT - ENGR - Signage Final | N/A | Not Applicable | Contractor informed the reason no signage on this project |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0110
Permit Description: Site/Grading - Kennedy Park. Construction of 3 baseball fields, new restroom, walking paths, and ass
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting went very well. We need to repair the inspection checklist as soon as possible. On the DP side they only show 3 items. Everything else is in the optional inspection list. Note all refuse enclosures have been inspected by building. |
|
| 11/14/2024 | Consultation SITE | Passed | This inspection was for the roof steel which would have been on the building permit. Development and engineering does all exterior inspections out of the envelope of any building. | |
| 05/09/2025 | Passed | |||
| 05/09/2025 | SITE - Zoning Final | Passed | ||
| 05/09/2025 | Passed | All test received, ADA compliance has been met. | ||
| 05/09/2025 | ENGR Paving | Passed | All test have been recived. | |
| 05/09/2025 | ENGR Grading Final | Passed | All test recieved. | |
| 05/09/2025 | For trash and recycling enclosures | Passed | ||
| 07/10/2025 | Passed | |||
| 09/02/2025 | ENGR Engineering Final | Passed | Passed one comment is to have the landscaper cut back to edge of walkway all lower branches that could take an eye out of a little kid walking by. |
|
| 09/02/2025 | LAND Landscape Appearance & Function Final | Passed | Passed |