Permit: DP22-0087
Permit Details
Status:
Complete
Type:
Development Package
Address:
2601 E SPEEDWAY BL
Address NEW:
2601 E SPEEDWAY BL
Apply Date:
04/06/2022
Applicant:
Anthony Capps
Description:
*AS Built started 2/8/24* Site - Lee Retail Center. Fish Wok. New drive-through window for restaurant.
Permit Reviews
Permit Number - DP22-0087
Permit Status: Complete
Permit Description: *AS Built started 2/8/24* Site - Lee Retail Center. Fish Wok. New drive-through window for restaurant.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/06/2022 | DEV PKG - OK TO SUBMIT | 04/13/2022 | COMPLETED |
| 04/13/2022 | DEV PKG | 07/12/2022 | COMPLETED |
| 07/12/2022 | DEV PKG - RESUBMITTAL | 08/31/2022 | COMPLETED |
| 05/16/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/07/2023 | APPROVED |
| 02/27/2024 | AS-BUILT v.2 | 03/05/2024 | APPROVED |
| 02/08/2024 | AS-BUILT v.1 | 02/21/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0087
Permite Description: *AS Built started 2/8/24* Site - Lee Retail Center. Fish Wok. New drive-through window for restaurant.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/11/2024 | SITE - Stormwater Setup and Controls | N/A | Not Ready | Provide stormwater controls as needed to prevent offsite discharge. |
| 01/11/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | contractor, please schedule inspections from development package permit. Please post address and provide Stormwater controls as needed. Contain all materials within job site. Trash enclosure is existing. Plans are under a review at this time. One accessible space shown. |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0087
Permit Description: *AS Built started 2/8/24* Site - Lee Retail Center. Fish Wok. New drive-through window for restaurant.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2024 | COT - ENGR - Signage Final | Passed | ||
| 06/26/2024 | ENGR Engineering Final | Passed | ||
| 06/26/2024 | PDSD Site/Engineering Division - Landscaping | Passed |