Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP22-0069
Permit Details
Apply Date:
03/23/2022
Applicant:
Description:
Site/Grading - International School of Tucson. Two new modular structures.
Permit Reviews
Permit Number - DP22-0069
Permit Status: Complete
Permit Description: Site/Grading - International School of Tucson. Two new modular structures.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/23/2022 | DEV PKG - OK TO SUBMIT | 04/07/2022 | COMPLETED |
| 04/07/2022 | DEV PKG | 06/16/2022 | COMPLETED |
| 07/05/2022 | DEV PKG | 07/27/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0069
Permite Description: Site/Grading - International School of Tucson. Two new modular structures.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | SITE - Stormwater Follow-up | N/A | Re-inspection required | |
| 10/28/2022 | SITE - Stormwater Setup and Controls | N/A | Re-inspection required | |
| 11/04/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Partial at this time OK for TCO for occupancy. Complete all landscaping is shown on the approved plans call back out for a reinspection |
| 01/04/2023 | ENGR Engineering Final | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0069
Permit Description: Site/Grading - International School of Tucson. Two new modular structures.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved. Luis on site. Contact Colton with Lloyd construction at 909-9351. Two modular buildings with no parking improvements.} | |
| 11/28/2022 | SITE - Stormwater Final Inspection | Passed | ||
| 11/28/2022 | COT - ENGR - Signage Final | Passed | ||
| 11/28/2022 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 11/28/2022 | ENGR Grading Final | Passed | Grading pass | |
| 01/05/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 01/06/2023 | ENGR Engineering Final | Passed |