Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/25/2022
Applicant:
Cary Broschat
Description:
SITE: City of Tucson - Hayden Udall. Solar 650 kW AC Photovoltaic, ground-mount and floating arrays

Permit Reviews

Permit Number - DP22-0039
Permit Status: Complete
Permit Description: SITE: City of Tucson - Hayden Udall. Solar 650 kW AC Photovoltaic, ground-mount and floating arrays
Start Date Submittal Complete Date Status  
02/25/2022 DEV PKG - OK TO SUBMIT 03/07/2022 COMPLETED Review Details
03/07/2022 DEV PKG 03/23/2022 COMPLETED Review Details
04/28/2022 DEV PKG - RESUBMITTAL 06/02/2022 COMPLETED Review Details
08/08/2022 DEV PKG - RESUBMITTAL 08/16/2022 COMPLETED Review Details
11/09/2022 DEVELOPMENT PACKAGE REVIEW v.2 11/29/2022 REQUIRES RESUBMIT Review Details
01/05/2023 DEVELOPMENT PACKAGE REVIEW v.1 01/05/2023 APPROVED Review Details
11/09/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/09/2022 REQUIRES RESUBMIT Review Details
11/29/2022 DEVELOPMENT PACKAGE REVIEW v.3 01/05/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0039
Permite Description: SITE: City of Tucson - Hayden Udall. Solar 650 kW AC Photovoltaic, ground-mount and floating arrays
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/28/2022 ENGR Grading Final N/A Canceled {Activity date: 04/28/2022; Status: Not Applicable; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - NA}

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0039
Permit Description: SITE: City of Tucson - Hayden Udall. Solar 650 kW AC Photovoltaic, ground-mount and floating arrays
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/21/2023 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed
04/21/2023 PDSD Engineering Division Pre-Construction SITE Passed
07/26/2023 ENGR Engineering Final Passed
07/26/2023 COT - ENGR - Stormwater Passed This is the final for the STORMWATER also
07/27/2023 SITE - Stormwater Final Inspection Passed
07/31/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
07/31/2023 SITE - Zoning Final Passed