Permit: DP22-0006
Permit Details
Status:
Inspections Complete
Type:
Development Package
Address:
5251 E LITTLETOWN RD
Address NEW:
5251 E LITTLETOWN RD
Apply Date:
01/17/2022
Applicant:
Description:
Tentative Plat/Floodplain/Swppp - The Reserve at Valencia Crossing. Lots 1 thru 50, and Common Areas
Permit Reviews
Permit Number - DP22-0006
Permit Status: Inspections complete
Permit Description: Tentative Plat/Floodplain/Swppp - The Reserve at Valencia Crossing. Lots 1 thru 50, and Common Areas
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/17/2022 | DEV PKG - OK TO SUBMIT | 01/28/2022 | COMPLETED |
| 01/28/2022 | TENTATIVE PLAT REVIEW | 04/04/2022 | COMPLETED |
| 04/29/2022 | TENTATIVE PLAT REVIEW | 07/04/2022 | COMPLETED |
| 06/06/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP22-0006
Permit Status: Inspections complete
Permit Description: Tentative Plat/Floodplain/Swppp - The Reserve at Valencia Crossing. Lots 1 thru 50, and Common Areas
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: DP22-0006
Permite Description: Tentative Plat/Floodplain/Swppp - The Reserve at Valencia Crossing. Lots 1 thru 50, and Common Areas
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Inform the contractor to call us call inspection every two weeks |
| 08/11/2023 | ENGR Grading Final | N/A | Not Ready | ABC in progress for remaining sections of streets within the sub division. |
| 08/22/2024 | SITE - Stormwater Final Inspection | N/A | Not Ready | Inlet protection needs to be upgraded and needs to be maintained until all dirt work and landscaping have been completed. This has been mentioned on several inspections and is and will jeopardize any and all other inspections to be scheduled on site. |
| 09/17/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Minor dirt on the street, street inlets in good shape, overall site is in good shape. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: DP22-0006
Permit Description: Tentative Plat/Floodplain/Swppp - The Reserve at Valencia Crossing. Lots 1 thru 50, and Common Areas
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2023 | SITE - SWPPP Correction Notice | Passed | ||
| 10/18/2023 | SITE - SWPPP Violation Notice | Passed | ||
| 10/18/2023 | SITE - Stormwater Setup and Controls | Passed | In place | |
| 10/18/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 04/01/2025 | COT - ENGR - Signage Final | Passed | ||
| 04/01/2025 | PDSD Site/Engineering Division - Landscaping | Passed | General landscaping looks good | |
| 10/09/2025 | ENGR Engineering Final | Passed | ||
| 10/09/2025 | PDSD Site/Engineering Division - NPPO | Passed |