Permit: DP21-0227
Permit Details
Apply Date:
08/31/2021
Applicant:
Elena Merchand
Description:
Site/Grading - Tucson Assisted Living Retreat. Building addition.
Permit Reviews
Permit Number - DP21-0227
Permit Status: Complete
Permit Description: Site/Grading - Tucson Assisted Living Retreat. Building addition.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2022 | DEV PKG - RESUBMITTAL | 01/21/2022 | COMPLETED |
08/31/2021 | DEV PKG - OK TO SUBMIT | 09/08/2021 | COMPLETED |
09/08/2021 | DEV PKG | 11/15/2021 | COMPLETED |
11/30/2021 | DEV PKG - RESUBMITTAL | 01/10/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0227
Permite Description: Site/Grading - Tucson Assisted Living Retreat. Building addition.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/06/2023 | ENGR Grading Final | N/A | Partial Pass | contractors installing the bollards in the roadway, both sides, and installing the sidewalks scuppers |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0227
Permit Description: Site/Grading - Tucson Assisted Living Retreat. Building addition.
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/15/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - APPROVED} ; {Activity date: 07/14/2022; Status: Not ready for Inspection; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PRE-CON NO CONTRACTOR ON SITE CALL 520-990-3790 WHEN} |
|
12/22/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
12/22/2023 | SITE - SWPPP Correction Notice | Passed | ||
12/22/2023 | SITE - Zoning Final | Passed | ||
12/22/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
12/22/2023 | ENGR Engineering Final | Passed | ||
12/22/2023 | SITE - Stormwater Follow-up | Passed | ||
12/22/2023 | ENGR Grading Final | Passed | ||
12/22/2023 | SITE - SWPPP Violation Notice | Passed | ||
12/22/2023 | SITE - Stormwater Final Inspection | Passed | ||
12/22/2023 | SITE - Stormwater Setup and Controls | Passed | ||
12/22/2023 | COT - ENGR - Signage Final | Passed |