Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP21-0208
Permit Details
Apply Date:
08/12/2021
Applicant:
Description:
Withdrawn - Site/Grading/Swppp - Palo Verde Behavioral Health. 28-bed addition and renovation. New drive and par
Permit Reviews
Permit Number - DP21-0208
Permit Status: Withdrawn
Permit Description: Withdrawn - Site/Grading/Swppp - Palo Verde Behavioral Health. 28-bed addition and renovation. New drive and par
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/03/2022 | DEV PKG - RESUBMITTAL | 09/01/2022 | COMPLETED |
08/12/2021 | DEV PKG - OK TO SUBMIT | 08/20/2021 | COMPLETED |
08/20/2021 | DEV PKG | 09/30/2021 | COMPLETED |
12/10/2021 | DEV PKG - RESUBMITTAL | 01/28/2022 | COMPLETED |
Outstanding Inspections
Permit Status: Withdrawn
Permit Number: DP21-0208
Permite Description: Withdrawn - Site/Grading/Swppp - Palo Verde Behavioral Health. 28-bed addition and renovation. New drive and par
Total Outstanding Inspections - 11
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
10/26/2022 | SITE - SWPPP Correction Notice | N/A | Not Ready | |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
10/26/2022 | SITE - SWPPP Violation Notice | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready |