Permit: DP21-0162
Permit Details
Status:
Inspections Complete
Type:
Development Package
Address:
5736 S 12TH AV
Address NEW:
5736 S 12TH AV
Apply Date:
06/23/2021
Applicant:
Andrew Christopher
Description:
*Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Permit Reviews
Permit Number - DP21-0162
Permit Status: Inspections complete
Permit Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/23/2021 | DEV PKG - OK TO SUBMIT | 06/30/2021 | COMPLETED |
| 06/30/2021 | DEV PKG | 08/19/2021 | COMPLETED |
| 09/22/2021 | DEV PKG - RESUBMITTAL | 10/21/2021 | COMPLETED |
| 03/20/2025 | DEVELOPMENT PACKAGE NEW v.3 | 04/08/2025 | REQUIRES RESUBMIT |
| 05/30/2024 | DEVELOPMENT PACKAGE NEW v.2 | 06/17/2024 | REQUIRES RESUBMIT |
| 06/04/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 07/08/2025 | APPROVED |
| 03/05/2024 | DEVELOPMENT PACKAGE NEW v.1 | 03/21/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: DP21-0162
Permite Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | contractors not ready for no inspections at all . Contractor needs to call Lynn for a pre-con inspection. |
| 09/13/2023 | SITE - Stormwater Follow-up | N/A | Not Ready | Will re-call Stormwater follow up in two weeks. Trash enclosure floor is ready for concrete pour (partial pass) |
| 01/18/2024 | ENGR Grading Final | N/A | Partial Pass | West rear of entire site needs to be final graded. |
| 01/18/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | All remaining 15 gallon mesquite trees are needing to be placed on North and East sections for site. Shrub count needs to be verified thru out site. |
| 01/18/2024 | ENGR Engineering Final | N/A | Partial Pass | Site fence needs to be removed. Railing for staircase leading to back door needs to be installed. Will review with Dave Robert’s the roll up door at rear of building. |
| 01/17/2024 | COT - ENGR - Signage Final | N/A | Not Ready | Address numbers will be added to exterior of building on Thursday 01/17/24. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: DP21-0162
Permit Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 01/17/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 01/17/2024 | SITE - SWPPP Correction Notice | Passed | ||
| 01/17/2024 | SITE - Stormwater Final Inspection | Passed | ||
| 01/18/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/17/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 01/17/2024 | SITE - Stormwater Follow-up | Passed | ||
| 01/17/2024 | SITE - SWPPP Violation Notice | Passed | ||
| 02/27/2026 | ENGR Grading Final | Passed | ||
| 02/27/2026 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 02/27/2026 | ENGR Engineering Final | Passed | ||
| 02/27/2026 | COT - ENGR - Signage Final | Passed |