Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Development Package
Address:
5736 S 12TH AV
Address NEW:
5736 S 12TH AV
Apply Date:
06/23/2021
Applicant:
Andrew Christopher
Description:
*Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.

Permit Reviews

Permit Number - DP21-0162
Permit Status: Inspections complete
Permit Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Start Date Submittal Complete Date Status  
06/23/2021 DEV PKG - OK TO SUBMIT 06/30/2021 COMPLETED Review Details
06/30/2021 DEV PKG 08/19/2021 COMPLETED Review Details
09/22/2021 DEV PKG - RESUBMITTAL 10/21/2021 COMPLETED Review Details
03/20/2025 DEVELOPMENT PACKAGE NEW v.3 04/08/2025 REQUIRES RESUBMIT Review Details
05/30/2024 DEVELOPMENT PACKAGE NEW v.2 06/17/2024 REQUIRES RESUBMIT Review Details
06/04/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 07/08/2025 APPROVED Review Details
03/05/2024 DEVELOPMENT PACKAGE NEW v.1 03/21/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: DP21-0162
Permite Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/24/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready contractors not ready for no inspections at all . Contractor needs to call Lynn for a pre-con inspection.
09/13/2023 SITE - Stormwater Follow-up N/A Not Ready Will re-call Stormwater follow up in two weeks.

Trash enclosure floor is ready for concrete pour (partial pass)
01/18/2024 ENGR Grading Final N/A Partial Pass West rear of entire site needs to be final graded.
01/18/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass All remaining 15 gallon mesquite trees are needing to be placed on North and East sections for site.

Shrub count needs to be verified thru out site.
01/18/2024 ENGR Engineering Final N/A Partial Pass Site fence needs to be removed.

Railing for staircase leading to back door needs to be installed.

Will review with Dave Robert’s the roll up door at rear of building.
01/17/2024 COT - ENGR - Signage Final N/A Not Ready Address numbers will be added to exterior of building on Thursday 01/17/24.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: DP21-0162
Permit Description: *Revision #1 started 3/5/24 (adding fence)* Site/Grading - Estrella Bakery, new parking lot and dumpster.
Total Completed Inspections - 12
Date Description Inspector Results Comments
01/17/2024 PDSD Site/Engineering Division - NPPO Passed
01/17/2024 PDSD Engineering Division Pre-Construction SITE Passed
01/17/2024 SITE - SWPPP Correction Notice Passed
01/17/2024 SITE - Stormwater Final Inspection Passed
01/18/2024 TRSP - ROW - Final/Close-Out Passed
01/17/2024 SITE - Stormwater Setup and Controls Passed
01/17/2024 SITE - Stormwater Follow-up Passed
01/17/2024 SITE - SWPPP Violation Notice Passed
02/27/2026 ENGR Grading Final Passed
02/27/2026 PDSD Site/Engineering Division - Landscaping Passed
02/27/2026 ENGR Engineering Final Passed
02/27/2026 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
5-DEVELOPMENT_AGREEMENT_V1.PDF DOCUMENTS VIEW
5-LANDSCAPE_MODIFICATION_APPROVAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV 1 APPROVED PLAN_SET-DEVELOPMENT_PLAN-REV_1_V6_V4 - STAMPED 07082025.PDF DOCUMENTS VIEW
DEVELOPMENT PACKAGE 1-8 OF 8.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 09.22.21.PDF DOCUMENTS VIEW
COMMENT_RESPONSE LETTER.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 06.14.21.PDF DOCUMENTS VIEW