Status:
Issued
Type:
Development Package
Address NEW:
5035 N WILD LIFE DR
Apply Date:
06/01/2021
Applicant:
Description:
Grading - Caballero Residence, new SFR.

Permit Reviews

Permit Number - DP21-0136
Permit Status: Issued
Permit Description: Grading - Caballero Residence, new SFR.
Start Date Submittal Complete Date Status  
06/01/2021 DEV PKG - OK TO SUBMIT 06/07/2021 COMPLETED Review Details
06/07/2021 GRADING 06/07/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0136
Permite Description: Grading - Caballero Residence, new SFR.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
07/14/2022 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 07/14/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - continue. No controls in place.} ; {Activity date: 06/17/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue. No controls installed}
10/20/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 10/20/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time.} ; {Activity date: 07/14/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - continue. No controls in place.} ; {Activity date: 06/30/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued dirt in Rodeway due to water utility work} ; {Activity date: 06/17/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue. No controls installed} ; {Activity date: 05/26/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 05/06/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continue. No issues or concerns at this time.} ; {Activity date: 04/13/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued no issues or concerns

} ; {Activity date: 01/25/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time. Mild erosion noted on unprotected slopes

} ; {Activity date: 11/02/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues or concerns at this time}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 SITE - SWPPP Correction Notice N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
06/28/2023 ENGR Grading Final N/A Complete (Recurring) courtesy, unscheduled inspection. Project appears to be nearing completion. Please schedule all remaining inspection designations from this permit for final approval. Remove any remaining construction debris and stabilize dirt areas.
06/29/2023 SITE - SWPPP Violation Notice N/A Not Applicable

Documents

File Name Document Type  
1-1 OF 1.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 05.28.21.PDF DOCUMENTS VIEW