Permit: DP21-0129
Permit Details
Status:
Inspections
Type:
Development Package
Address:
351 N COMMERCE PARK LP
Address NEW:
351 N COMMERCE PARK LP
Apply Date:
05/24/2021
Applicant:
Description:
Revision 1 - Restricted Access SITE - Intermountain Academy Park Improvements. Shade structures over playground equipment. (owner
Permit Reviews
Permit Number - DP21-0129
Permit Status: Inspections
Permit Description: Revision 1 - Restricted Access SITE - Intermountain Academy Park Improvements. Shade structures over playground equipment. (owner
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/24/2021 | DEV PKG - OK TO SUBMIT | 06/10/2021 | COMPLETED |
| 06/28/2021 | DEV PKG - OK TO SUBMIT | 07/01/2021 | COMPLETED |
| 07/01/2021 | DEV PKG | 08/05/2021 | COMPLETED |
| 10/12/2021 | DEV PKG - RESUBMITTAL | 11/08/2021 | COMPLETED |
| 12/21/2021 | DEV PKG - RESUBMITTAL | 01/10/2022 | COMPLETED |
| 07/30/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 08/28/2024 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP21-0129
Permite Description: Revision 1 - Restricted Access SITE - Intermountain Academy Park Improvements. Shade structures over playground equipment. (owner
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2025 | Assurance - Initial (Roadways, Utilities, Basins) ENGR | N/A | Not Ready | 5/8/25 Jacob Thrasher 5206973201 Third party test results for completed work still needed. Basin also has been proposed but not approved. |
Completed Inspections
Permit Status: Inspections
Permit Number: DP21-0129
Permit Description: Revision 1 - Restricted Access SITE - Intermountain Academy Park Improvements. Shade structures over playground equipment. (owner
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2022 | ENGR Engineering Final | Passed | {Activity date: 07/27/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved} ; {Activity date: 07/27/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by VVERA1 - Approved} | |
| 05/06/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | For the contractor to install all the track out rock and have all the testing done the subgrade day B grade asphalt and call him every two weeks for swap inspection |