Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
10/09/2020
Applicant:
Description:
Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.

Permit Reviews

Permit Number - DP20-0207
Permit Status: Issued
Permit Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Start Date Submittal Complete Date Status  
04/08/2022 DEV PKG - OK TO SUBMIT 05/04/2022 COMPLETED Review Details
05/24/2022 REVISION - - 1ST 06/20/2022 COMPLETED Review Details
10/09/2020 DEV PKG - OK TO SUBMIT (GRADING ONLY) 10/12/2020 COMPLETED Review Details
10/14/2020 GRADING 12/17/2020 COMPLETED Review Details
12/22/2020 GRADING 01/05/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0207
Permite Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/04/2022 ENGR Engineering Final N/A Complete (Recurring) {Activity date: 10/04/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN SIDEWALKS NOT COMPLETED} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL} ; {Activity date: 06/10/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS NOT READY AT THIS TIME COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS

} ; {Activity date: 01/14/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - NOT READY AT THIS TIME, COMPLETE ALL WORK ON THIS SITE TO THE POINT THAT LESS THAN ONE ACRE IS OPEN, EXPOSED, OR UNDEVELOPED.}
10/04/2022 SITE - Stormwater Final Inspection N/A Complete (Recurring) {Activity date: 10/04/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN}
10/10/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 10/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/26/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL NO CONCERNS AT THIS TIME} ; {Activity date: 08/05/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME MINOR CLEANUP OF SEDIMENT REQUIRED IN THE STREETS

} ; {Activity date: 06/10/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - ) IS CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 05/02/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /NO CONCERNS AT IS TIME.} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/NO CONCERNS AT IS TIME} ; {Activity date: 01/14/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED, NO CONCERNS AT THIS TIME.} ; {Activity date: 08/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / PLACING THE 32” STORM DRAIN RCP TO THE DRAIN BASIN. ON THE NORTH END OF PROJECT.} ; {Activity date: 05/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/31/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN, NEED TO PLACE THE WADDLES AROUND THE STOCK PILE.} ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION.

}
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 SITE - Stormwater Setup and Controls N/A Not Ready
11/16/2022 ENGR Grading Final N/A Complete (Recurring) Need to reschedule

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0207
Permit Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/28/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/28/2021; Status: Approved; Inspector: DROBRTS; Comment: Entered by RSALDAT1 - I MET WITH BRIAN FROM DESERT EARTH AND THE DEVELOPER TO DISCUSS THE FUTURE WORK. I REMINDED THEM TO START SCHEDULING THEIR BI-WEEKLY SWPPP INSPECTIONS AND KEEP THE STREET CLEAN.} ; {Activity date: 01/15/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY AT THIS TIME}
08/05/2022 COT - ENGR - Signage Final Passed {Activity date: 08/05/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED}

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
REV-1_5051A_TRN_COT_BELLATIERRAPH1B, COVER LETTER.PDF DOCUMENTS VIEW
REV-1_REFERENCE WORD ADDED_5051A_APPROVED GRADING PLAN.PDF DOCUMENTS VIEW
TRN_COT_COVER LETTER.PDF DOCUMENTS VIEW
TRN_COT_BELLATIERRAPH1B_TRANSMITTAL COVER LETTER.PDF DOCUMENTS VIEW
REVISION EXPLANATION LETTER.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 04.07.22.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PH1B_GRADING1STCOMMENTS_RESPONSE.PDF DOCUMENTS VIEW
TRNS_TRANSMITTAL SHEET.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, 12.22.20.PDF DOCUMENTS VIEW
APPLICATION_SIGNED.PDF DOCUMENTS VIEW
DRAINAGESTATEMENT01.PDF DOCUMENTS VIEW
GEOTECH REPORT 120618 REV1.PDF DOCUMENTS VIEW
SWPPP3-WINGATEPHASE 1A 1B DEV, 427 PAGES.PDF DOCUMENTS VIEW
TRANSMITTAL SHEET_1STSUBMITTAL.PDF DOCUMENTS VIEW