Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Permit Reviews
Permit Number - DP20-0207
Permit Status: Issued
Permit Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/08/2022 | DEV PKG - OK TO SUBMIT | 05/04/2022 | COMPLETED |
05/24/2022 | REVISION - - 1ST | 06/20/2022 | COMPLETED |
10/09/2020 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 10/12/2020 | COMPLETED |
10/14/2020 | GRADING | 12/17/2020 | COMPLETED |
12/22/2020 | GRADING | 01/05/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0207
Permite Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2022 | ENGR Engineering Final | N/A | Complete (Recurring) | {Activity date: 10/04/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN SIDEWALKS NOT COMPLETED} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL} ; {Activity date: 06/10/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS NOT READY AT THIS TIME COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS } ; {Activity date: 01/14/2022; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - NOT READY AT THIS TIME, COMPLETE ALL WORK ON THIS SITE TO THE POINT THAT LESS THAN ONE ACRE IS OPEN, EXPOSED, OR UNDEVELOPED.} |
10/04/2022 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | {Activity date: 10/04/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN} |
10/10/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 10/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN} ; {Activity date: 09/26/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL NO CONCERNS AT THIS TIME} ; {Activity date: 08/05/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME MINOR CLEANUP OF SEDIMENT REQUIRED IN THE STREETS } ; {Activity date: 06/10/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - ) IS CONTINUED NO CONCERNS AT THIS TIME} ; {Activity date: 05/02/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /NO CONCERNS AT IS TIME.} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/NO CONCERNS AT IS TIME} ; {Activity date: 01/14/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - CONTINUED, NO CONCERNS AT THIS TIME.} ; {Activity date: 08/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / PLACING THE 32” STORM DRAIN RCP TO THE DRAIN BASIN. ON THE NORTH END OF PROJECT.} ; {Activity date: 05/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/31/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN, NEED TO PLACE THE WADDLES AROUND THE STOCK PILE.} ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION. } |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
11/16/2022 | ENGR Grading Final | N/A | Complete (Recurring) | Need to reschedule |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0207
Permit Description: Grading/SWPPP - Bella Tierra, Phase 1-B, Lots 137-227 and common areas A and B.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/28/2021; Status: Approved; Inspector: DROBRTS; Comment: Entered by RSALDAT1 - I MET WITH BRIAN FROM DESERT EARTH AND THE DEVELOPER TO DISCUSS THE FUTURE WORK. I REMINDED THEM TO START SCHEDULING THEIR BI-WEEKLY SWPPP INSPECTIONS AND KEEP THE STREET CLEAN.} ; {Activity date: 01/15/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY AT THIS TIME} | |
08/05/2022 | COT - ENGR - Signage Final | Passed | {Activity date: 08/05/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} |