Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0185
Permit Details
Apply Date:
09/17/2020
Applicant:
Fernan Salazar
Description:
Tentative Plat - 3329 E. Glenn Street, Lots 1 and 2.
Permit Reviews
Permit Number - DP20-0185
Permit Status: Complete
Permit Description: Tentative Plat - 3329 E. Glenn Street, Lots 1 and 2.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2021 | TENTATIVE PLAT REVIEW | 02/03/2021 | COMPLETED |
02/03/2021 | TENTATIVE PLAT REVIEW | 02/05/2021 | COMPLETED |
09/17/2020 | DEV PKG - OK TO SUBMIT | 09/22/2020 | COMPLETED |
09/22/2020 | TENTATIVE PLAT REVIEW | 11/18/2020 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP20-0185
Permite Description: Tentative Plat - 3329 E. Glenn Street, Lots 1 and 2.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/22/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 03/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO COBCERNS NOTED AT THIS TIME, SEE THE COMMENTS MADE IN THE GRADING INTERMEDIATE INSPECTION FOR THIS SAME DATE.} ; {Activity date: 03/09/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE WATTLES AND TRACK-OUT ROCK IN PLACE} |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0185
Permit Description: Tentative Plat - 3329 E. Glenn Street, Lots 1 and 2.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/07/2023 | SITE - Stormwater Setup and Controls | Passed | ready for final | |
12/07/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ready for final | |
12/18/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
12/18/2023 | COT - ENGR - Signage Final | Passed | ||
12/18/2023 | SITE - Stormwater Final Inspection | Passed | ||
12/18/2023 | ENGR Engineering Final | Passed | ||
12/18/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
12/18/2023 | ENGR Grading Final | Passed |