Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Approved
Type:
Development Package
Address:
3900 E GRANT RD
Address NEW:
3900 E GRANT RD
Apply Date:
07/20/2020
Applicant:
Description:
SITE - 3900-3962 E. Grant Road, Grant Rd. Cure Plan, Phases 3 and 4. (Revision to DP20-0121).

Permit Reviews

Permit Number - DP20-0146
Permit Status: Approved
Permit Description: SITE - 3900-3962 E. Grant Road, Grant Rd. Cure Plan, Phases 3 and 4. (Revision to DP20-0121).
Start Date Submittal Complete Date Status  
07/20/2020 DEV PKG - OK TO SUBMIT 07/21/2020 COMPLETED Review Details

Outstanding Inspections

Permit Status: Approved
Permit Number: DP20-0146
Permite Description: SITE - 3900-3962 E. Grant Road, Grant Rd. Cure Plan, Phases 3 and 4. (Revision to DP20-0121).
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
10/24/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Setup and Controls N/A Not Ready
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready

Completed Inspections

Permit Status: Approved
Permit Number: DP20-0146
Permit Description: SITE - 3900-3962 E. Grant Road, Grant Rd. Cure Plan, Phases 3 and 4. (Revision to DP20-0121).
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/31/2023 SITE - Stormwater Follow-up Passed stormwater controls appear adequate
10/31/2023 ENGR Grading Final Passed no grading performed, shopping plaza has been complete for several years
10/31/2023 SITE - Stormwater Setup and Controls Passed stormwater controls appear adequate
10/31/2023 PDSD Engineering Division Pre-Construction SITE Passed no pre con meeting conducted