Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0037
Permit Details
Status:
Complete
Type:
Development Package
Address:
5150 E SPEEDWAY BL
Address NEW:
5150 E SPEEDWAY BL
Apply Date:
02/13/2020
Applicant:
burak bekat
Description:
SITE - Enterprise Speedway, reconfigure and add to parking lot.
Permit Reviews
Permit Number - DP20-0037
Permit Status: Complete
Permit Description: SITE - Enterprise Speedway, reconfigure and add to parking lot.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2020 | DEV PKG - OK TO SUBMIT | 02/19/2020 | COMPLETED |
| 02/19/2020 | DEV PKG | 03/24/2020 | COMPLETED |
| 04/28/2020 | DEV PKG - RESUBMITTAL | 05/08/2020 | COMPLETED |
| 05/08/2020 | DEV PKG - RESUBMITTAL | 05/11/2020 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0037
Permit Description: SITE - Enterprise Speedway, reconfigure and add to parking lot.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/05/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - . Approved. Add FaceTime preconstruction meeting with GC went over approved plans.} | |
| 07/28/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} | |
| 07/28/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} | |
| 07/28/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} | |
| 07/28/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} | |
| 07/28/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 07/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} | |
| 09/03/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/03/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 09/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 08/04/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/08/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} | |
| 09/03/2020 | ENGR Grading Final | Passed | {Activity date: 09/03/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} | |
| 09/09/2020 | ENGR Engineering Final | Passed | {Activity date: 09/09/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved. After conversation with Armando About existing site. Made superintend it for general contractor and architect both aware of existing areas on site that slopes were not per code.} ; {Activity date: 09/03/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. ADA accessible path from ADA parking over 2% Cross slope. Existing sidewalk on east side of building and area south of building between restrooms over 2% cross slopes and running slopes at restroom doors. Add van accessible to ADA parking sign.} |