Permit Details

Status:
Complete
Type:
Development Package
Address:
438 E PRINCE RD
Apply Date:
01/31/2020
Applicant:
Description:
SITE - Casa Maria Apartments, electric gate.

Permit Reviews

Permit Number - DP20-0031
Permit Status: Complete
Permit Description: SITE - Casa Maria Apartments, electric gate.
Start Date Submittal Complete Date Status  
02/04/2020 DEV PKG 03/05/2020 COMPLETED Review Details
03/16/2020 DEV PKG - RESUBMITTAL 04/16/2020 COMPLETED Review Details
12/30/2019 DEV PKG - OK TO SUBMIT 02/04/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0031
Permit Description: SITE - Casa Maria Apartments, electric gate.
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/31/2020 SITE - Stormwater Follow-up Passed {Activity date: 08/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
08/31/2020 SITE - Stormwater Final Inspection Passed {Activity date: 08/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
08/31/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 08/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
09/01/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/01/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
09/01/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/01/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
09/18/2020 ENGR Engineering Final Passed {Activity date: 09/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 09/09/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - not ready. Fire has not approved permit T 20 CM02708} ; {Activity date: 09/01/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. 24 foot clearance shown on plan, fire department access lockbox and accessible parking space and ramp shown on plan. Please provide the required items and/or revise the plan as necessary. Anne At 906-0219}
03/03/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/23/2020; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not applicable}
03/03/2022 ENGR Grading Final Passed {Activity date: 03/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Please change status to final approved, as all inspections have been approved} ; {Activity date: 09/01/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 08/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 07/01/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continue. Gate and perimeter fencing has been installed by Dusty at 808-7682. Development package plan indicates additional work. Please schedule for all inspections when ready}
03/03/2022 COT - ENGR - Signage Final Passed {Activity date: 03/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/23/2020; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not applicable}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
1-1 OF 1.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION.PDF DOCUMENTS VIEW
COMMENT REPLY LETTER, 03.11.2020.PDF DOCUMENTS VIEW