Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
250 E GRANT RD
Apply Date:
10/04/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Alborada Apts, 250 E. Grant Road.

Permit Reviews

Permit Number - DP19-0240
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Alborada Apts, 250 E. Grant Road.
Start Date Submittal Complete Date Status  
01/15/2020 DEV PKG - RESUBMITTAL 01/22/2020 COMPLETED Review Details
09/05/2019 DEV PKG - OK TO SUBMIT 10/09/2019 COMPLETED Review Details
10/09/2019 DEV PKG 11/13/2019 COMPLETED Review Details
12/05/2019 DEV PKG - RESUBMITTAL 01/13/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0240
Permit Description: SITE/GRADING/SWPPP - Alborada Apts, 250 E. Grant Road.
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/28/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/28/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - }
04/28/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 04/28/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 12/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out rock has mixed with dirt and has become less effective} ; {Activity date: 10/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Trackout protection in place.} ; {Activity date: 08/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Stormwater controls have been installed} ; {Activity date: 08/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Controls are in place.}
05/13/2021 SITE - Stormwater Follow-up Passed {Activity date: 05/13/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 04/30/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUES} ; {Activity date: 01/27/2021; Status: Continued; Inspector: BBNEDON; Comment: Entered by VLEON1 - CONTINUE - MINOR TRACK OUT NOTED AFTER LAST RAIN EVENT} ; {Activity date: 12/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - continued} ; {Activity date: 12/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out on sixth Avenue

} ; {Activity date: 11/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Minor amounts of track out} ; {Activity date: 10/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continues. No issues or concerns at this time.} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continue. No issues at this time} ; {Activity date: 09/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued.} ; {Activity date: 09/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Dirt has been cleaned as requested} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - . Continued. Dan with Barker. Please remove dirt ramp on sixth Avenue, and please remove any dirt and rocks from north sidewalk and correct stormwater controls as necessary along northern edge of site

} ; {Activity date: 09/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Some dirt spilling onto sidewalk through fence

} ; {Activity date: 09/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues at this time} ; {Activity date: 08/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out on sixth Avenue. Controls are in place.} ; {Activity date: 08/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Controls in place} ; {Activity date: 08/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time.}
06/15/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/15/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 05/12/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Ground covering left to complete in a few areas.} ; {Activity date: 04/30/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - SUPPORT TREES ARE REQUIRED}
06/25/2021 SITE - Stormwater Final Inspection Passed {Activity date: 06/25/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - Approved N0T received} ; {Activity date: 06/23/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Provide NOT for SWPPP permit. Remove all temporary Stormwater controls. Clean any dirt or mud accumulation from Stormwater catch basins. Roy with Canyon} ; {Activity date: 06/15/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Provide notice of termination for SWPPP per month.

}
07/08/2021 COT - ENGR - Signage Final Passed {Activity date: 07/08/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 06/22/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Roy with Canyon. Please consult with designing engineer for signed elevation} ; {Activity date: 06/15/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 06/16/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Sign final. Contractor will properly install accessibility signage as shown. Please change yesterday’s inspection results from not applicable to not ready.

}
07/15/2021 ENGR Grading Final Passed {Activity date: 07/15/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09027, 09183, 09186, 09190, Approved}
04/05/2024 ENGR Engineering Final Passed
04/05/2024 PDSD Engineering Division Pre-Construction SITE Passed

Documents

File Name Document Type  
1-12 OF 12.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
ALBORADA GRANT CONTRACTOR LETTER.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PRE-APP_COMMENTS.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
CIVIL_RESPONSE LETTER, 12.05.19.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
CIVIL_RESPONSE, 01.15.2020.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW