Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3570 N CRAYCROFT RD
Apply Date:
09/27/2019
Applicant:
Description:
SITE/GRADING - Chase Bank.1st Revision is pending, July 2020 (grease interceptor).

Permit Reviews

Permit Number - DP19-0231
Permit Status: Complete
Permit Description: SITE/GRADING - Chase Bank.1st Revision is pending, July 2020 (grease interceptor).
Start Date Submittal Complete Date Status  
01/21/2020 DEV PKG - RESUBMITTAL 01/23/2020 COMPLETED Review Details
07/03/2020 DEV PKG - OK TO SUBMIT 07/06/2020 COMPLETED Review Details
07/06/2020 REVISION - - 1ST 07/17/2020 COMPLETED Review Details
08/28/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 10/01/2019 COMPLETED Review Details
10/01/2019 DEV PKG 11/13/2019 COMPLETED Review Details
11/22/2019 DEV PKG - RESUBMITTAL 12/31/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0231
Permit Description: SITE/GRADING - Chase Bank.1st Revision is pending, July 2020 (grease interceptor).
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/21/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
07/21/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/21/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
08/11/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/11/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/11/2020 SITE - Stormwater Follow-up Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/21/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME}
08/11/2020 ENGR Grading Final Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/11/2020 SITE - Stormwater Final Inspection Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/11/2020 COT - ENGR - Signage Final Passed {Activity date: 08/11/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/13/2020 ENGR Engineering Final Passed {Activity date: 08/13/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved. Grease trap demo approved per Dave Roberts.} ; {Activity date: 08/11/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all striping install wheel stops complete all work on approved plan.

}

Documents

File Name Document Type  
REVISION EMAIL, 07.02.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
TEP APPROVAL LETTER, 11.12.19.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 11.12.19.PDF DOCUMENTS VIEW
RESPONSE LETTER, 11.22.19.PDF DOCUMENTS VIEW
DRC APPROVAL LETTER, DESIGN REVIEW COMM..PDF DOCUMENTS VIEW
RESPONSE LETTER, 01.21.2020.PDF DOCUMENTS VIEW
1-8 OF 8.PDF DEVELOPMENT PACKAGE VIEW