Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
834 S 6TH AV
Apply Date:
09/09/2019
Applicant:
Hector Jimenez
Description:
SITE/GRADING - The Flash North, 19-unit apt. and retail.

Permit Reviews

Permit Number - DP19-0217
Permit Status: Complete
Permit Description: SITE/GRADING - The Flash North, 19-unit apt. and retail.
Start Date Submittal Complete Date Status  
08/09/2019 DEV PKG - OK TO SUBMIT 09/11/2019 COMPLETED Review Details
09/11/2019 DEV PKG 10/18/2019 COMPLETED Review Details
11/07/2019 DEV PKG - RESUBMITTAL 12/11/2019 COMPLETED Review Details
12/18/2019 DEV PKG - RESUBMITTAL 01/07/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0217
Permit Description: SITE/GRADING - The Flash North, 19-unit apt. and retail.
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/14/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 05/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
05/14/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } ; {Activity date: 05/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - }
05/20/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/14/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by VLEON1 - DENIED COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS, OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE.
} ; {Activity date: 05/14/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by VLEON1 - DENIED COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS, OR PROVIDE APPROVED REVISED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE.}
05/20/2021 ENGR Engineering Final Passed {Activity date: 05/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/14/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by VLEON1 - DENIED FOR 844 S 6TH AV. NOTED DURING THIS INSPECTION A STEP IN THE INTERNAL PEDESTRIAN PATHWAY THAT IS NOT SHOWN ONTHE APPROVED PLANS. THIS WILL BE CHECKED WITH ZONING AND ENGINEERING TO ENSURE THAT THIS IS ACCEPTABLE BY CODE. THE CONTRACTOR NEEDS TO COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS AND THEN CALL FOR A FINAL RE-INSPECTION.} ; {Activity date: 05/14/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by VLEON1 - DENIED. NOTED DURING THIS INSPECTION A STEP IN THE INTERNAL PEDESTRIAN PATHWAY THAT IS NOT SHOWN ONTHE APPROVED PLANS. THIS WILL BE CHECKED WITH ZONING AND ENGINEERING TO ENSURE THAT THIS IS ACCEPTABLE BY CODE. THE CONTRACTOR NEEDS TO COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS AND THEN CALL FOR A FINAL RE-INSPECTION.}
05/20/2021 ENGR Grading Final Passed {Activity date: 05/20/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
AVIGATION EASEMENT, PIMA CO. RECORDED.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
LOT COMBO REQUEST.PDF DOCUMENTS VIEW
DEVELOPMENT-COMMENT RESP LTR, 11.06.19.PDF DOCUMENTS VIEW
DRAINAGE SUMMARY LETTER THE FLASH NORTH.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER, 12.18.19.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
1-10 OF 10.PDF DEVELOPMENT PACKAGE VIEW