Permit: DP19-0184
Permit Details
Status:
Complete
Type:
Development Package
Address:
3253 E VALENCIA RD
Address NEW:
3253 E VALENCIA RD
Apply Date:
08/02/2019
Applicant:
Description:
SITE/GRADING - Valencia Commercial, Jimmy Johns, 4200sf food service.
Permit Reviews
Permit Number - DP19-0184
Permit Status: Complete
Permit Description: SITE/GRADING - Valencia Commercial, Jimmy Johns, 4200sf food service.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2019 | DEV PKG - OK TO SUBMIT | 08/06/2019 | COMPLETED |
| 08/06/2019 | DEV PKG | 09/05/2019 | COMPLETED |
| 09/05/2019 | DEV PKG - RESUBMITTAL | 10/09/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0184
Permit Description: SITE/GRADING - Valencia Commercial, Jimmy Johns, 4200sf food service.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2020 | ENGR Engineering Final | Passed | {Activity date: 07/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Approved} ; {Activity date: 07/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Remove excess dirt from water harvesting areas shown on page 8 of civil drawings. Provide minimum of 6 inches of clear space below the inlet of each basin. Install rip rap as specified.} ; {Activity date: 07/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete accessible signs, complete grading at water harvesting basins prior to starting landscaping. Install bicycle parking. Check slope of accessible parking and access.} | |
| 07/31/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Approved} ; {Activity date: 06/25/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - Partially approved. Bob at373-4994. Starting grading and starting trash enclosure. Will forward contact information. Schedule rebar inspections. Maintain the site. Provide water harvesting depressions and basins as shown. Bottom of curb inlet to top of finish materials required.} | |
| 07/31/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 07/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Approved} ; {Activity date: 07/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete accessible signs, complete grading at water harvesting basins prior to starting landscaping. Install bicycle parking. Check slope of accessible parking and access.} | |
| 08/04/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 07/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Complete ground coverings remove nursery stakes and cut down exterior sewer clean out. } ; {Activity date: 07/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Remove excess dirt from water harvesting areas shown on page 8 of civil drawings. Provide minimum of 6 inches of clear space below the inlet of each basin. Install rip rap as specified.} |
|
| 08/04/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
| 08/04/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
| 08/04/2020 | ENGR Grading Final | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
| 08/04/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} | |
| 11/19/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/19/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } |