Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP19-0128
Permit Details
Apply Date:
05/23/2019
Applicant:
Anthony Mills
Description:
TENTATIVE PLAT/FLD/HPZ - 811 S. 4th Ave, Lots 1-7 and common area "A" (private parking).
Permit Reviews
Permit Number - DP19-0128
Permit Status: Inspections
Permit Description: TENTATIVE PLAT/FLD/HPZ - 811 S. 4th Ave, Lots 1-7 and common area "A" (private parking).
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/14/2020 | TENTATIVE PLAT REVIEW | 05/18/2020 | COMPLETED |
04/25/2019 | DEV PKG - OK TO SUBMIT | 05/24/2019 | COMPLETED |
06/22/2020 | TENTATIVE PLAT REVIEW | 07/27/2020 | COMPLETED |
07/23/2019 | DEV PKG - OK TO SUBMIT | 08/22/2019 | COMPLETED |
08/22/2019 | TENTATIVE PLAT REVIEW | 10/01/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP19-0128
Permite Description: TENTATIVE PLAT/FLD/HPZ - 811 S. 4th Ave, Lots 1-7 and common area "A" (private parking).
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
11/01/2024 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | no answer to phone call. |
Completed Inspections
Permit Status: Inspections
Permit Number: DP19-0128
Permit Description: TENTATIVE PLAT/FLD/HPZ - 811 S. 4th Ave, Lots 1-7 and common area "A" (private parking).
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
11/08/2023 | SITE - Stormwater Follow-up | Passed | ||
11/08/2023 | SITE - Stormwater Setup and Controls | Passed | ||
11/08/2023 | COT - ENGR - Signage Final | Passed | ||
11/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
11/14/2023 | ENGR Engineering Final | Passed | ||
11/14/2023 | ENGR Grading Final | Passed |