Permit Details

Status:
Complete
Type:
Development Package
Address:
6295 E 22ND ST
Address NEW:
6295 E 22ND ST
Apply Date:
05/02/2019
Applicant:
Description:
SITE/GRADING - The Human Bean, drive-thru coffee shop, parking lot, retention basins.

Permit Reviews

Permit Number - DP19-0110
Permit Status: Complete
Permit Description: SITE/GRADING - The Human Bean, drive-thru coffee shop, parking lot, retention basins.
Start Date Submittal Complete Date Status  
04/09/2019 DEV PKG - OK TO SUBMIT 05/10/2019 COMPLETED Review Details
05/02/2019 DEV PKG - OK TO SUBMIT 05/06/2019 COMPLETED Review Details
05/13/2019 DEV PKG 06/17/2019 COMPLETED Review Details
08/08/2019 DEV PKG - RESUBMITTAL 09/04/2019 COMPLETED Review Details
09/05/2019 DEV PKG - RESUBMITTAL 09/17/2019 COMPLETED Review Details
09/17/2019 DEV PKG - RESUBMITTAL 09/17/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0110
Permit Description: SITE/GRADING - The Human Bean, drive-thru coffee shop, parking lot, retention basins.
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/14/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/14/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
05/20/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/20/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/20/2020 SITE - Stormwater Follow-up Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/20/2020 SITE - Stormwater Final Inspection Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/20/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/20/2020 COT - ENGR - Signage Final Passed {Activity date: 05/20/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
05/21/2020 ENGR Grading Final Passed {Activity date: 05/21/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - }
06/01/2020 ENGR Engineering Final Passed {Activity date: 06/01/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/21/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete install of sidewalk scupper per approved plans.
} ; {Activity date: 05/20/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Install sidewalk scupper on south side of building per approved plans For final.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
ALTA_SURVEY 04.15.19.PDF DOCUMENTS VIEW
APPLICATION 04.22.19.PDF DOCUMENTS VIEW
18127ALTA.PDF DOCUMENTS VIEW
COMMENTS-RESP-6.28.19.PDF DOCUMENTS VIEW
COMBOAPPROVAL, 128-01-041A DOCUMENTS VIEW
PIMA COUNTY ASSESSOR COMBOREQUEST.PDF DOCUMENTS VIEW
SEC 8_ SOLIDWASTE FIG 2 (CORRECTED 06.28.19).PDF DOCUMENTS VIEW
SEC 8_ SOLIDWASTE FIG 3B (CORRECTED 06.28.19).PDF DOCUMENTS VIEW
TDOT ROW ENCROACHMENT APPROVAL_07.24.19.PDF DOCUMENTS VIEW
COMMENTS-RESPONSES-9.03.19.PDF DOCUMENTS VIEW
COMMENT RESPONSE, 09.17.19.PDF DOCUMENTS VIEW
1-10 OF 10.PDF DEVELOPMENT PACKAGE VIEW