Permit Details

Status:
Issued
Type:
Development Package
Address:
1002 E 36TH ST
Apply Date:
04/02/2019
Applicant:
Lisa Bowers
Description:
GRADING/SWPPP - The Bridges Pad Sub-Area B-1.

Permit Reviews

Permit Number - DP19-0081
Permit Status: Issued
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Start Date Submittal Complete Date Status  
03/04/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 04/05/2019 COMPLETED Review Details
04/09/2019 GRADING 04/16/2019 COMPLETED Review Details
05/11/2021 REVISION - - 1ST 05/11/2021 COMPLETED Review Details
05/11/2021 DEV PKG - OK TO SUBMIT 05/21/2021 COMPLETED Review Details
05/21/2021 REVISION - - 2ND 06/15/2021 COMPLETED Review Details
07/07/2021 DEV PKG - OK TO SUBMIT 07/16/2021 COMPLETED Review Details
07/16/2021 REVISION - - 3RD 08/20/2021 ACTIVE Review Details
09/16/2019 DEV PKG - OK TO SUBMIT 09/30/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP19-0081
Permite Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
09/24/2020 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out protection has been installed at west side entrance.} ; {Activity date: 12/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The cotton burn has been installed to protect the existing basin.}
05/24/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 05/24/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 1500 E 36TH ST} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues or concerns at this time. Track out protection is in place

} ; {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued, Minor trackout on Park Avenue} ; {Activity date: 07/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out protection is in place. Most of the site has weeds But disturbed areas do you need stabilization.} ; {Activity date: 01/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time. Track out protection is still in place} ; {Activity date: 12/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted on Martin Luther King Jr.} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is still moving dirt from this site to Park Avenue. Street sweepers are keeping the streets clean.} ; {Activity date: 11/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Track out is present on Park Avenue 36 street and on Martin Luther King Junior, however it is evident that it has been swept. Additionally two sweepers Are working the areas.} ; {Activity date: 11/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 10 trucks and two street sweepers transferring material to the Park Avenue site.
} ; {Activity date: 11/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Border land construction and Harvey trucking I still moving dirt to the 3300 E. Park site. Street sweeper is making laps up and down the street. Minimal amounts of track out Noted.} ; {Activity date: 11/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is moving dirt between this site and 3300 South Park Ave. Borderland has a street sweeper cleaning up the track out as needed.
}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0081
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/08/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/08/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
REV-3_ONLINE SUBMITTAL PAGE, RECVD 07.07.21.PDF PLANS UNDER REVIEW VIEW
SWPPP.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, 05.11.21.PDF DOCUMENTS VIEW
SUMMARY OF CHANGES REVISION LETTER.PDF DOCUMENTS VIEW
COT ACTIVITY PERMIT BRIDGES BLOCK 1.PDF DOCUMENTS VIEW
THE BRIDGES CONTRACTOR LETTERS 4-11-19.PDF DOCUMENTS VIEW
APPLICATION_B-I.PDF DOCUMENTS VIEW
COMMENT_RESP LTR, 04.08.19.PDF DOCUMENTS VIEW
REVISION_LETTER, 09.16.19.PDF DOCUMENTS VIEW
1-3 OF 3.PDF DEVELOPMENT PACKAGE VIEW