Permit: DP19-0081
Permit Details
Apply Date:
04/02/2019
Applicant:
Lisa Bowers
Description:
GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Permit Reviews
Permit Number - DP19-0081
Permit Status: Issued
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/04/2019 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 04/05/2019 | COMPLETED |
04/09/2019 | GRADING | 04/16/2019 | COMPLETED |
05/11/2021 | REVISION - - 1ST | 05/11/2021 | COMPLETED |
05/11/2021 | DEV PKG - OK TO SUBMIT | 05/21/2021 | COMPLETED |
05/21/2021 | REVISION - - 2ND | 06/15/2021 | COMPLETED |
07/07/2021 | DEV PKG - OK TO SUBMIT | 07/16/2021 | COMPLETED |
07/16/2021 | REVISION - - 3RD | 08/20/2021 | ACTIVE |
09/16/2019 | DEV PKG - OK TO SUBMIT | 09/30/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0081
Permite Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2020 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out protection has been installed at west side entrance.} ; {Activity date: 12/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The cotton burn has been installed to protect the existing basin.} |
05/24/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 05/24/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 1500 E 36TH ST} ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues or concerns at this time. Track out protection is in place } ; {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued, Minor trackout on Park Avenue} ; {Activity date: 07/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out protection is in place. Most of the site has weeds But disturbed areas do you need stabilization.} ; {Activity date: 01/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time. Track out protection is still in place} ; {Activity date: 12/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted on Martin Luther King Jr.} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is still moving dirt from this site to Park Avenue. Street sweepers are keeping the streets clean.} ; {Activity date: 11/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Track out is present on Park Avenue 36 street and on Martin Luther King Junior, however it is evident that it has been swept. Additionally two sweepers Are working the areas.} ; {Activity date: 11/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 10 trucks and two street sweepers transferring material to the Park Avenue site. } ; {Activity date: 11/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Border land construction and Harvey trucking I still moving dirt to the 3300 E. Park site. Street sweeper is making laps up and down the street. Minimal amounts of track out Noted.} ; {Activity date: 11/13/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is moving dirt between this site and 3300 South Park Ave. Borderland has a street sweeper cleaning up the track out as needed. } |
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0081
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-Area B-1.
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/08/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } |