Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
12/10/2018
Applicant:
Linda Thompson
Description:
TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open

Permit Reviews

Permit Number - DP18-0293
Permit Status: Issued
Permit Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Start Date Submittal Complete Date Status  
02/15/2019 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 03/28/2019 COMPLETED Review Details
04/05/2021 DEV PKG - OK TO SUBMIT 04/16/2021 COMPLETED Review Details
04/16/2019 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 04/23/2019 COMPLETED Review Details
04/16/2021 REVISION - - 1ST 05/08/2021 COMPLETED Review Details
11/08/2018 DEV PKG - OK TO SUBMIT 12/11/2018 COMPLETED Review Details
12/12/2018 TENTATIVE PLAT REVIEW 01/16/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP18-0293
Permite Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/19/2025 ENGR Engineering Final N/A Not Ready Missing sidewalk along Kolb Rd connecting existing sidewalk to Julien Wash Pathway.

Completed Inspections

Permit Status: Issued
Permit Number: DP18-0293
Permit Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Total Completed Inspections - 8
Date Description Inspector Results Comments
05/05/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED}
10/19/2023 SITE - Stormwater Follow-up Passed
10/19/2023 SITE - Stormwater Setup and Controls Passed
10/19/2023 PDSD Engineering Division Pre-Construction SITE Passed
10/19/2023 COT - ENGR - Signage Final Passed
12/18/2023 ENGR Grading Final Passed
09/19/2025 PDSD Site/Engineering Division - Landscaping Passed Site landscaping is complete and per plans, irrigation system is functional.
09/19/2025 SITE - Stormwater Final Inspection Passed Site is stabilized, SWPPP measures are removed and no longer necessary.