Permit: DP18-0293
Permit Details
Status:
Issued
Type:
Development Package
Address:
6995 E CAMINO BOLEADORAS
Address NEW:
6995 E CAMINO BOLEADORAS
Apply Date:
12/10/2018
Applicant:
Linda Thompson
Description:
TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Permit Reviews
Permit Number - DP18-0293
Permit Status: Issued
Permit Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/15/2019 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 03/28/2019 | COMPLETED |
| 04/05/2021 | DEV PKG - OK TO SUBMIT | 04/16/2021 | COMPLETED |
| 04/16/2019 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 04/23/2019 | COMPLETED |
| 04/16/2021 | REVISION - - 1ST | 05/08/2021 | COMPLETED |
| 11/08/2018 | DEV PKG - OK TO SUBMIT | 12/11/2018 | COMPLETED |
| 12/12/2018 | TENTATIVE PLAT REVIEW | 01/16/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP18-0293
Permite Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2025 | ENGR Engineering Final | N/A | Not Ready | Missing sidewalk along Kolb Rd connecting existing sidewalk to Julien Wash Pathway. |
Completed Inspections
Permit Status: Issued
Permit Number: DP18-0293
Permit Description: TENTATIVE PLAT - La Estancia de Tucson, Block 26, proposed lots 1-47 and common area "A" (park/open
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2022 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/05/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - APPROVED} | |
| 10/19/2023 | SITE - Stormwater Follow-up | Passed | ||
| 10/19/2023 | SITE - Stormwater Setup and Controls | Passed | ||
| 10/19/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 10/19/2023 | COT - ENGR - Signage Final | Passed | ||
| 12/18/2023 | ENGR Grading Final | Passed | ||
| 09/19/2025 | PDSD Site/Engineering Division - Landscaping | Passed | Site landscaping is complete and per plans, irrigation system is functional. | |
| 09/19/2025 | SITE - Stormwater Final Inspection | Passed | Site is stabilized, SWPPP measures are removed and no longer necessary. |