Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP18-0157
Permit Details
Apply Date:
06/25/2018
Applicant:
Ryan Stucki
Description:
GRADING - Saguaro Trails, Block 6 Stockpile
Permit Reviews
Permit Number - DP18-0157
Permit Status: Issued
Permit Description: GRADING - Saguaro Trails, Block 6 Stockpile
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/11/2019 | REVISION - GRADING | 03/04/2019 | ACTIVE |
06/25/2018 | GRADING | 06/25/2018 | COMPLETED |
06/25/2018 | GRADING | 06/26/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP18-0157
Permit Status: Issued
Permit Description: GRADING - Saguaro Trails, Block 6 Stockpile
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/23/2018 |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP18-0157
Permite Description: GRADING - Saguaro Trails, Block 6 Stockpile
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/14/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 04/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/02/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Track out on Drexel from stockpile to new pad that dirt works is building up. Dave Roberts stop by on Friday to talk to them about the track out.} ; {Activity date: 11/19/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Stock pile is being moved to location on site within saguaro trails subdivision.} ; {Activity date: 11/16/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time. } ; {Activity date: 11/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 10/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - 09154 stormwater follow up inspection. Continue. No concerns at this time.} ; {Activity date: 09/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/18/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/27/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/07/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/31/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/17/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time} ; {Activity date: 07/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 06/18/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time. } ; {Activity date: 05/06/2020; Status: Continued; Inspector: RLEDDONNE; Comment: Entered by VFLORES1 - No concerns at this time} ; {Activity date: 02/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 10/21/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/11/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No track out at this time.} ; {Activity date: 07/11/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/26/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/10/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/15/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 03/07/2019; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/21/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCRENS AT THIS TIME.} ; {Activity date: 02/12/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/04/2019; Status: Continued; Inspector: RLEDONN E; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/24/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 12/05/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 10/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/23/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 10/15/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 09/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/28/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/30/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TALKED WITH JAY KNOLL ABOUT SWPPP CONTROLS THAT NEED TO BE INSTALLED.} ; {Activity date: 07/25/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STILL NO SWPPP COTROLS INSTALLED.} ; {Activity date: 07/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH JAY KNOLL ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 07/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH CONTACTOR ABOUT SWPPP REPAIR.} |
Completed Inspections
Permit Status: Issued
Permit Number: DP18-0157
Permit Description: GRADING - Saguaro Trails, Block 6 Stockpile
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/27/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALL SWPPP CONTROLS AND COMPLET NPPO.} | |
10/11/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
10/11/2023 | ENGR Engineering Final | Passed | ||
10/11/2023 | ENGR Grading Final | Passed | ||
10/11/2023 | SITE - Stormwater Final Inspection | Passed | ||
10/11/2023 | SITE - Stormwater Setup and Controls | Passed | The stock pile that was there has been removed. That particular phase of houses are completed. |