Permit: DP18-0154
Permit Details
Status:
Complete
Type:
Development Package
Address:
9251 S EISENHOWER RD
Address NEW:
9251 S EISENHOWER RD
Apply Date:
06/21/2018
Applicant:
Description:
SITE AND GRADING - SANTA CRUZ WATER PRODUCTION FACILITY
Permit Reviews
Permit Number - DP18-0154
Permit Status: Complete
Permit Description: SITE AND GRADING - SANTA CRUZ WATER PRODUCTION FACILITY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2018 | SITE and/or GRADING | 06/22/2018 | COMPLETED |
| 06/22/2018 | SITE and/or GRADING | 07/24/2018 | COMPLETED |
| 08/26/2019 | SITE and/or GRADING | 08/26/2019 | COMPLETED |
Conditions
Permit Number - DP18-0154
Permit Status: Complete
Permit Description: SITE AND GRADING - SANTA CRUZ WATER PRODUCTION FACILITY
| Date | Description | Comments |
|---|---|---|
| 07/23/2018 | A complete SWPPP manual for the project is to be provided during the initial pre-construction meeting. |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0154
Permit Description: SITE AND GRADING - SANTA CRUZ WATER PRODUCTION FACILITY
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | ENGR Engineering Final | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | ENGR Grading Final | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/05/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Jeremy with PCL at 602-228-3037. I requested that he schedule inspections from his development package permit and provide approved civil drawings for The site inspections required.} ; {Activity date: 08/30/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor needs to call in for a preconstruction meeting.} | |
| 12/05/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 12/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 12/11/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - A friend} |