Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP18-0108
Permit Details
Status:
Complete
Type:
Development Package
Address:
3540 N CRAYCROFT RD
Address NEW:
3540 N CRAYCROFT RD
Apply Date:
05/04/2018
Applicant:
Lisa Bowers
Description:
GRADING ONLY
Permit Reviews
Permit Number - DP18-0108
Permit Status: Complete
Permit Description: GRADING ONLY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2018 | GRADING | 05/10/2018 | ACTIVE |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0108
Permit Description: GRADING ONLY
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/15/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 05/15/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 05/15/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/20/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/20/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/20/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/20/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/24/2018 | ENGR Engineering Final | Passed | {Activity date: 08/24/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/19/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NOTES ON ENGINEERING FINAL.} | |
| 08/24/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/24/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/24/2018 | ENGR Grading Final | Passed | {Activity date: 08/24/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |