Permit: DP18-0069
Permit Details
Apply Date:
03/28/2018
Applicant:
Description:
SITE
Permit Reviews
Permit Number - DP18-0069
Permit Status: Complete
Permit Description: SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2018 | SITE and/or GRADING | 04/24/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0069
Permit Description: SITE
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2018 | ENGR Engineering Final | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/05/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED AT THE FOOTERS FOR THE NEW SHADE STRUCTURE, FOOTERS ARE OKAY TO POUR AT THIS TIME. ANY UTILITIES THAT HAVE BEEN DAMAGED(WATERLINES) WILL NEED TO BE REPAIRED PRIOR TO THE FINAL.} |