Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
2850 E GANLEY RD
Address NEW:
2850 E GANLEY RD
Apply Date:
02/22/2018
Applicant:
George Lance
Description:
SITE - JB Steel, expansion to and partial renovation of the existing general mfg. building "A".

Permit Reviews

Permit Number - DP18-0046
Permit Status: Complete
Permit Description: SITE - JB Steel, expansion to and partial renovation of the existing general mfg. building "A".
Start Date Submittal Complete Date Status  
02/22/2018 DEV PKG - OK TO SUBMIT 02/22/2018 COMPLETED Review Details
02/22/2018 SITE and/or GRADING 04/04/2018 COMPLETED Review Details
04/04/2018 RESUB - SITE and/or GRADING 06/08/2018 COMPLETED Review Details
08/21/2019 DEV PKG - REVISION 09/13/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0046
Permit Description: SITE - JB Steel, expansion to and partial renovation of the existing general mfg. building "A".
Total Completed Inspections - 5
Date Description Inspector Results Comments
10/11/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is no checkout to be noted at this time. The concrete work and building have already been constructed. The site is over 2 acres yet the contractor does not have an SWPPP.}
10/11/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/27/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - there are no controls in place.}
10/11/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/11/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/27/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - This is an unscheduled preconstruction meeting with Charlie from Chestnut contractors at 975-3323. I asked Charlie to schedule a preconstruction meeting even though the project is one month from completion. The site is over 2 acres yet there is no mention of our SWPPP on his city approved plans. The plan does call for a van accessible parking space and loading zone and an expanded detention basin.}
11/19/2019 ENGR Engineering Final Passed {Activity date: 11/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/11/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Accessible parking space exceeds 2% slope. Existing landscape area has not been depressed as shown on plan. Basin needs to be cleaned out. Small plants have been installed along property line.} ; {Activity date: 04/24/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - Inspection 9027 ENGINEERING FINAL IS PARTIAL AT THIS TIME, OK FOR TCO. FINAL NOT TO BE GIVEN TILL ALL WORK HAS BEEN COMPLETED FOR DP18-0046 AND IT IS APPROVED. THE ADA HANDICAP SPOTS WILL NEED TO BE CHECKED TO VERIFY THAT THEY ARE WITHIN COMPLIANCE, INSTALL THE LONGTERM BICYCLE PARKING, REESTABLISH THE WATER HARVESTING BASIN WEST OF THE NEW BUILDING, COMPLETE LANDSCAPING AS NEEDED.}
11/19/2019 ENGR Grading Final Passed {Activity date: 11/19/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/11/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Accessible parking space exceeds 2% slope. Existing landscape area has not been depressed as shown on plan. Basin needs to be cleaned out. Small plants have been installed along property line.} ; {Activity date: 03/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The plan indicates rework of the Accessible parking}

Documents

File Name Document Type  
REVISION LETTER, 08.09.19.PDF DOCUMENTS VIEW
1-4 OF 4.PDF DOCUMENTS VIEW