Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/08/2018
Applicant:
paul nzomo
Description:
E SITE - U-HAUL OF ALVERNON HEIGHTS

Permit Reviews

Permit Number - DP18-0033
Permit Status: Complete
Permit Description: E SITE - U-HAUL OF ALVERNON HEIGHTS
Start Date Submittal Complete Date Status  
02/08/2018 DEV PKG - OK TO SUBMIT 02/12/2018 COMPLETED Review Details
04/05/2018 DEV PKG - OK TO SUBMIT 04/10/2018 COMPLETED Review Details
04/10/2018 DEV PKG 05/16/2018 COMPLETED Review Details
06/18/2018 DEV PKG 07/17/2018 COMPLETED Review Details
08/24/2018 DEV PKG - RESUBMITTAL 09/06/2018 COMPLETED Review Details
09/06/2018 DEV PKG - RESUBMITTAL 09/26/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0033
Permit Description: E SITE - U-HAUL OF ALVERNON HEIGHTS
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/13/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/13/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
09/13/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/13/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH BRIAN ON SITE FOR PER-CON.} ; {Activity date: 09/13/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
09/25/2018 SITE - Stormwater Follow-up Passed {Activity date: 09/25/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/20/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - There are no concerns at this time.}
09/25/2018 SITE - Stormwater Final Inspection Passed {Activity date: 09/25/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - } ; {Activity date: 09/25/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/21/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSPECTION NOT READY AT THIS TIME, CALL WHEN THE SITE WORK HAS BEEN COMPLETED}
10/01/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/01/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/01/2018 ENGR Grading Final Passed {Activity date: 10/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/01/2018 COT - ENGR - Signage Final Passed {Activity date: 10/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/05/2018 ENGR Engineering Final Passed {Activity date: 10/05/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/02/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL THE WORK ON THIS SITE AS SHOWN ON THE APPROVED PLANS FOR ALL OF THE LANDSCAPE ITEMS. CURRENTLY THERE ARE TREES MISSING THROUGHOUT THE SITE THAT NEED TO BE INSTALLED, AND PLANTS MISSING AT THE NORTHWEST CORNER OF THE SITE. IF THESE ARE NOT NEEDED TO BE INSTALLED THE ENGINEER OF RECORD NEEDS TO REMOVE THEM FROM THE PLANS AND PROVIDE US WITH A SET OF APPROVED REVISED DRAWINGS.} ; {Activity date: 10/01/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE WILL BE INSPECTED ON 10/2/18 FOR ALL OF THE FINAL INSPECTIONS.} ; {Activity date: 09/25/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - } ; {Activity date: 09/21/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSPECTION NOT READY AT THIS TIME, CALL WHEN THE SITE WORK HAS BEEN COMPLETED}

Documents

File Name Document Type  
1 OF 3 OF 3.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION FORM .PDF DOCUMENTS VIEW
SECOND SUBMITTAL COMMENTS REVIEW.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
COMBO DOCUMENTS VIEW
COMMENTS RESPONSE LETTER .PDF DOCUMENTS VIEW
EXISTING LANDSCAPING PLANTS ALL.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
SIGNED PERMIT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW