Permit: DP18-0014
Permit Details
Status:
Complete
Type:
Development Package
Address:
4101 E IRVINGTON RD
Address NEW:
4101 E IRVINGTON RD
Apply Date:
01/16/2018
Applicant:
Lisa Bowers
Description:
E SITE/GRADE - KE&G OFFICE BUILDING
Permit Reviews
Permit Number - DP18-0014
Permit Status: Complete
Permit Description: E SITE/GRADE - KE&G OFFICE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2018 | DEV PKG - OK TO SUBMIT | 01/17/2018 | COMPLETED |
| 01/18/2018 | DEV PKG | 03/06/2018 | COMPLETED |
| 03/06/2018 | DEV PKG - RESUBMITTAL | 04/10/2018 | COMPLETED |
| 04/10/2018 | DEV PKG - RESUBMITTAL | 04/17/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0014
Permit Description: E SITE/GRADE - KE&G OFFICE BUILDING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED 2) ENSURE DISTURBED SOIL IS KEPT ON SITE DURING CONSTRUCTION 3) CALL FOR ANY SITE/LANDSCAPING CONCERNS AND/OR CHANGES} |
|
| 08/07/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/02/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 08/07/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 09/18/2018 | ENGR Engineering Final | Passed | {Activity date: 09/18/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 09/18/2018 | ENGR Grading Final | Passed | {Activity date: 09/18/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |