Permit: DP18-0013
Permit Details
Status:
Issued
Type:
Development Package
Address:
6740 S SANTA CLARA AV
Address NEW:
6740 S SANTA CLARA AV
Apply Date:
01/16/2018
Applicant:
Description:
SITE
Permit Reviews
Permit Number - DP18-0013
Permit Status: Issued
Permit Description: SITE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2018 | SITE and/or GRADING | 01/16/2018 | ACTIVE |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP18-0013
Permite Description: SITE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP18-0013
Permit Description: SITE
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/08/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/08/2018 | ENGR Grading Final | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/08/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/08/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/19/2018; Status: Denied; Inspector: DROBERT5; Comment: Entered by DROBERT5 - NO ONE ON SITE AT 9:00 AM, CALLED AND LEFT A MESSAGE FOR THE SITE AFTER ARRIVING, PHONE CALL RETURNED AT AROUND 9:45. I ADVISED THE CONTRACTOR THAT WE WOULD MEET ONSITE ON 1/25/2018 BETWEEN 8 AND 9 O'CLOCK TO DISCUSS THE WORK THAT IS TO HAPPEN. THIS SITE MAY HAVE BEEN STARTED ALREADY AT THIS TIME ON THE EXTERIOR OUTER BOUNDARIES OF THE PARKING LOT, BASINS AND TREES HAVE BEEN INSTALLED PRIOR TO THIS DATE.} | |
| 03/08/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 03/08/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 05/11/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/11/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/14/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE OUT TO THIS SITE TO SEE IF THE LANDSCAPING HAD BEEN COMPLETED AS PREVIOUSLY DISCUSSED. THE NURSARY STAKES ARE STILL IN THE GROUND SO I AM UNABLE TO APPROVE THE PERMIT AT THIS TIME.} ; {Activity date: 03/09/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE LANDSCAPING FOR THIS SITE PER THE APPROVED PLANS. REMOVE ALL NURSARY STAKES AND REPLACE WITH THE ACCEPTABLE STAKING FOR THE SITE AS SHOWN IN THE APPROVED PLANS.} | |
| 05/11/2021 | ENGR Engineering Final | Passed | {Activity date: 05/11/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/09/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE THE CITY OF TUCSON WITH APPROVED REVISED DRAWINGS FOR ANY AND ALL CHANGES FOR THIS SITE TO BE UTILIZED DURING THE FINAL INSPECTION .PROVIDE US WITH A COPY OF THE N.O.T. FROM THE STATE, AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.} |