Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Approved
Type:
Development Package
Address NEW:
3390 N SILVERBELL RD
Apply Date:
01/09/2018
Applicant:
Ryan Stucki
Description:
GRADING - HAUL ROAD -CONNECTION BETWEEN PHASE A AND B FOR SILVERBELL CROSSINGS

Permit Reviews

Permit Number - DP18-0007
Permit Status: Approved
Permit Description: GRADING - HAUL ROAD -CONNECTION BETWEEN PHASE A AND B FOR SILVERBELL CROSSINGS
Start Date Submittal Complete Date Status  
01/09/2018 GRADING 01/24/2018 ACTIVE Review Details
01/09/2018 GRADING 01/09/2018 COMPLETED Review Details

Outstanding Inspections

Permit Status: Approved
Permit Number: DP18-0007
Permite Description: GRADING - HAUL ROAD -CONNECTION BETWEEN PHASE A AND B FOR SILVERBELL CROSSINGS
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 SITE - Stormwater Setup and Controls N/A Not Ready
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Approved
Permit Number: DP18-0007
Permit Description: GRADING - HAUL ROAD -CONNECTION BETWEEN PHASE A AND B FOR SILVERBELL CROSSINGS
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/09/2024 PDSD Site/Engineering Division - NPPO Passed