Permit: DP17-0283
Permit Details
Apply Date:
11/30/2017
Applicant:
Description:
CHURCH ADDITION: BATHROOM AND STEEPLES
Permit Reviews
Permit Number - DP17-0283
Permit Status: Complete
Permit Description: CHURCH ADDITION: BATHROOM AND STEEPLES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/05/2018 | RESUB - SITE and/or GRADING | 03/09/2018 | COMPLETED |
| 03/09/2018 | RESUB - SITE and/or GRADING | 03/09/2018 | COMPLETED |
| 03/09/2018 | RESUB - SITE and/or GRADING | 10/03/2018 | COMPLETED |
| 11/30/2017 | DEV PKG - OK TO SUBMIT | 12/22/2017 | COMPLETED |
| 12/22/2017 | SITE and/or GRADING | 01/31/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0283
Permit Description: CHURCH ADDITION: BATHROOM AND STEEPLES
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2019 | ENGR Engineering Final | Passed | {Activity date: 01/28/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/23/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET THE CONTRACTOR ON SITE AND HAVE FOUND THIS SITE INCOMPLETE AT THIS TIME DUE TO THE FACT THAT THE ADA COMPLIANT PARKING SPACES HAVE NOT BEEN COMPLETED PER THE APPROVED PLANS. I HAVE ADVISED THE CONTRACTOR TO EITHER STRIPE IT PER THE APPROVED PLAN OR PROVIDE ME A REVISED APPROVED DRAWING SHOWING THAT THE PROPOSED CHANGES HAVE BEEN ACCEPTED BY BOTH THE ZONING AND ENGINEERING REVIEWER.} ; {Activity date: 01/15/2019; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} |