Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3189 W TUMAMOC DR
Apply Date:
09/15/2017
Applicant:
Description:
GRADING ONLY/SFR

Permit Reviews

Permit Number - DP17-0230
Permit Status: Complete
Permit Description: GRADING ONLY/SFR
Start Date Submittal Complete Date Status  
03/13/2018 REVISION - GRADING 03/13/2018 COMPLETED Review Details
09/15/2017 GRADING 09/15/2017 ACTIVE Review Details
09/15/2017 RESUB - SITE/GRADING ALL 11/14/2017 COMPLETED Review Details
11/14/2017 RESUB - SITE and/or GRADING 11/14/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0230
Permit Description: GRADING ONLY/SFR
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/12/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 01/12/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/12/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/12/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/09/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/09/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/09/2019 ENGR Engineering Final Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/09/2019 SITE - Stormwater Follow-up Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT CLEAN UP AND REPAIRS TO CONTROLS.}
01/09/2019 ENGR Grading Final Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/09/2019 SITE - Stormwater Final Inspection Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/09/2019 COT - ENGR - Signage Final Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }