Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
06/12/2017
Applicant:
Lisa Bowers
Description:
SITE/GRADING - ZAYO TELECOM

Permit Reviews

Permit Number - DP17-0133
Permit Status: Complete
Permit Description: SITE/GRADING - ZAYO TELECOM
Start Date Submittal Complete Date Status  
06/12/2017 DEV PKG - OK TO SUBMIT 06/19/2017 COMPLETED Review Details
06/19/2017 DEV PKG 09/01/2017 COMPLETED Review Details
09/01/2017 DEV PKG - RESUBMITTAL 11/27/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0133
Permit Description: SITE/GRADING - ZAYO TELECOM
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/08/2017 SITE - Stormwater Final Inspection Passed {Activity date: 12/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/08/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 12/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/08/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/11/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/08/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE MONITORING REPORT.}
01/11/2018 COT - ENGR - Signage Final Passed {Activity date: 01/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/08/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/13/2018 SITE - Stormwater Follow-up Passed {Activity date: 02/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/13/2018 ENGR Grading Final Passed {Activity date: 02/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/08/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/06/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/06/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 06/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) THE SITE NEEDS TO HAVE HYDROSEED PLACED IN ALL AREAS THAT HAVE BEEN DISTRUBED DURING THIS CONSTRUCTION.
2) REMOVE ALL OF THE EXISTING WEEDS FROM ALL OF THE LANDSCAPED AREA PRIOR TO CALLING FOR THE FINAL INSPECTIONS.} ; {Activity date: 06/25/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE LANDSCAPING ON THIS SITE AS SHOWN ON THE APPROVED PLANS, OR PROVIDE THE APPROVED PLANS NOTING ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE.
1) NONE OF THE PLANTS HAVE BEEN INSTALLED SOUTH OF FAIR.
2) PIP #15 DOES NOT APPEAR TO HAVE BEEN SAVED.
3) HYDEROSEED ALLL PREVIOUSLY DISTURBED AREAS.} ; {Activity date: 02/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE THE CREENING MATERIAL ON THE NORTH CHAINLINK FENCE.} ; {Activity date: 12/08/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/06/2021 ENGR Engineering Final Passed {Activity date: 05/06/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 06/27/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) THE SITE NEEDS TO HAVE HYDROSEED PLACED IN ALL AREAS THAT HAVE BEEN DISTRUBED DURING THIS CONSTRUCTION.
2) REMOVE ALL OF THE EXISTING WEEDS FROM ALL OF THE LANDSCAPED AREA PRIOR TO CALLING FOR THE FINAL INSPECTIONS.} ; {Activity date: 06/25/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE LANDSCAPING ON THIS SITE AS SHOWN ON THE APPROVED PLANS, OR PROVIDE THE APPROVED PLANS NOTING ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE.
1) NONE OF THE PLANTS HAVE BEEN INSTALLED SOUTH OF FAIR.
2) PIP #15 DOES NOT APPEAR TO HAVE BEEN SAVED.
3) HYDEROSEED ALLL PREVIOUSLY DISTURBED AREAS.} ; {Activity date: 02/13/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL LANDSCAPING AND THE INSTALLATION OF THE SLATS IN THE CHAINLINK FENCE AS NOTED ON THE APPROVED PLANS. OR PROVIDE A SET OF APPROVED REVISED DRAWINGS SHOWING ALL THE CHANGES THAT HAVE BEEN MADE TO THIS SITE.} ; {Activity date: 12/08/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING / DRAINAGE / SWPPP_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
004_SITE CIVIL DETAILS_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITY_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
006_NPPO_6 OF 10.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_7 OF 10.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_8 OF 10.TIF DEVELOPMENT PACKAGE VIEW
009_WATER HARVESTING_9 OF 10.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE CONSTRUCTION DETAILS_10 OF 10.TIF DEVELOPMENT PACKAGE VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
None DOCUMENTS VIEW