Permit: DP17-0109
Permit Details
Apply Date:
05/05/2017
Applicant:
Description:
SIDEWALK RAMP
Permit Reviews
Permit Number - DP17-0109
Permit Status: Complete
Permit Description: SIDEWALK RAMP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/05/2017 | SITE and/or GRADING | 05/05/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0109
Permit Description: SIDEWALK RAMP
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/08/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | ENGR Engineering Final | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | ENGR Grading Final | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
05/08/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
06/26/2017 | RSBU - Building Final | Passed | {Activity date: 06/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |