Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
3525 E 34TH ST
Apply Date:
04/26/2017
Applicant:
Description:
SITE/GRADING/SWPPP- PENSKE TRUCK STORAGE

Permit Reviews

Permit Number - DP17-0100
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- PENSKE TRUCK STORAGE
Start Date Submittal Complete Date Status  
01/16/2018 DEV PKG - RESUBMITTAL 01/22/2018 COMPLETED Review Details
04/26/2017 DEV PKG - OK TO SUBMIT 04/26/2017 COMPLETED Review Details
04/26/2017 DEV PKG 06/07/2017 COMPLETED Review Details
05/30/2018 SITE and/or GRADING 06/04/2018 COMPLETED Review Details
08/30/2017 DEV PKG - RESUBMITTAL 09/25/2017 COMPLETED Review Details
10/18/2017 DEV PKG - RESUBMITTAL 12/04/2017 COMPLETED Review Details
12/04/2017 DEV PKG - RESUBMITTAL 01/16/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0100
Permit Description: SITE/GRADING/SWPPP- PENSKE TRUCK STORAGE
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/31/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/31/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/27/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 02/27/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/11/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/11/2018 SITE - Stormwater Follow-up Passed {Activity date: 07/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/05/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE SITE. I HAVE ADVISED THE CONTRACTOR TO WATCH THE RAINS THAT MAYBE HAPPENING THIS WEEKEND. HE WILL BE WATCHING TO SEE WHAT HAPPENS SINCE THEY HAVE JUST LAYED DOWN THE FRESH ABC AND THEY HAVE NOT PROCESSED IT AT THIS TIME.} ; {Activity date: 06/21/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS FOR THIS SITE AT THIS TIME} ; {Activity date: 06/19/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/27/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 02/27/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
07/11/2018 ENGR Grading Final Passed {Activity date: 07/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/11/2018 COT - ENGR - Signage Final Passed {Activity date: 07/11/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/20/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL PLANTS AS SHOWN ON THE APPROVED PLANS, AND STAKE ALL TREES PROPERLY AS SHOWN IN THE DETAILS.}
07/20/2018 ENGR Engineering Final Passed {Activity date: 07/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS
1) PROVIDE THIS DEPARTMENT WITH ALL CLOSING DOCUMENTS(REVISED DRAWING, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND NOTICE OF TERMINATION)
2) VERIFY THE DEPTH OF THE ROCK RIP RAP AT ALL LOCATIONS WITHIN THE BASIN AREASAND THE USE OF FILTER FABRIC.
3) STAKE ALL TREES AS SHOWN ON THE APPROVED PLANS IF THEY NEED TO BE STAKED.}
07/20/2018 SITE - Stormwater Final Inspection Passed {Activity date: 07/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, PROVIDE THE NOTICE OF TERMINATION FOR THIS SITE.} ; {Activity date: 07/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE US WITH A COPY OF THE NOTICE OF TERMINATION FOR THIS SITE}

Documents

File Name Document Type  
001_COVER SHEET_CS-1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_A1-0.TIF DEVELOPMENT PACKAGE VIEW
003_SITE DETAILS_A1-1.TIF DEVELOPMENT PACKAGE VIEW
004_NOTES_4 OF 24.TIF DEVELOPMENT PACKAGE VIEW
005_OVERALL DEVELOPMENT SITE_5 OF 24.TIF DEVELOPMENT PACKAGE VIEW
006_SECTIONS / DETAILS_6 OF 24.TIF DEVELOPMENT PACKAGE VIEW
007_GRADING / PAVING_7 OF 24.TIF DEVELOPMENT PACKAGE VIEW
008_HORIZONTAL CONTROL_8 OF 24.TIF DEVELOPMENT PACKAGE VIEW
009_SWPPP_9 OF 24.TIF DEVELOPMENT PACKAGE VIEW
010_SWPPP DETAILS_10 OF 24.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE INVENTORY_11 OF 24.TIF DEVELOPMENT PACKAGE VIEW
012_PLANTING / IRRIGATION NOTES_12 OF 24.TIF DEVELOPMENT PACKAGE VIEW
013_PLANTING / NOTES_13 OF 24.TIF DEVELOPMENT PACKAGE VIEW
014_RAINWATER HARVESTING IMPLEMENTATION_14 OF 24.TIF DEVELOPMENT PACKAGE VIEW
015_RAINWATER HARVESTING IMPLEMENTATION_15 OF 24.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE INVENTORY_16 OF 24.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE INVENTORY_17 OF 24.TIF DEVELOPMENT PACKAGE VIEW
018_PLANTING / NOTES_18 OF 24.TIF DEVELOPMENT PACKAGE VIEW
019_RAINWATER HARVESTING IMPLEMENTATION_19 OF 24.TIF DEVELOPMENT PACKAGE VIEW
020_RAINWATER HARVESTING IMPLEMENTATION_20 OF 24.TIF DEVELOPMENT PACKAGE VIEW
021_SYMBOLS / SCHEDULES_E0.0.TIF DEVELOPMENT PACKAGE VIEW
022_ELECTRICAL SITE PLAN_E1.0.TIF DEVELOPMENT PACKAGE VIEW
023_SITE PHOTOMETRIC_E2.0.TIF DEVELOPMENT PACKAGE VIEW
024_RAINWATER HARVESTING IMPLEMENTATION_E3.0.TIF DEVELOPMENT PACKAGE VIEW
- DRAINAGE REPORT.PDF DOCUMENTS VIEW
KG RESPONSE LETTER 01-11-18.PDF DOCUMENTS VIEW
LANDSCAPE RESPONSE LETTER11118.PDF DOCUMENTS VIEW
2_GEO_LETTER REPORT PENSKE PARKING LOT ADDITION (1).PDF DOCUMENTS VIEW
2_GEO_LETTER REPORT PENSKE PARKING LOT ADDITION (2).PDF DOCUMENTS VIEW
2_O & M MAXWELL IV.PDF DOCUMENTS VIEW
1_ZONING ADMINISTRATOR LETTER 11-1-16.PDF DOCUMENTS VIEW
2_RESPONSE_ZONING.PDF DOCUMENTS VIEW
2_TOPO SURVEY.PDF DOCUMENTS VIEW
2_RESPONSE_LANDSCAPE & NATIVE PLANT.PDF DOCUMENTS VIEW
2_RESPONSE_ENG.PDF DOCUMENTS VIEW
2_RESPONSE_ENG REDLINES.PDF DOCUMENTS VIEW
1_DRG MEMO - PENSKE - TUCSON 2017 0425.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
L OF C DP17-0100.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW