Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
434 W LERDO RD
Address NEW:
434 W LERDO RD
Apply Date:
04/19/2017
Applicant:
David Gary Gerovac
Description:
SITE/GRADING/SWPP - MATH & SCIENCE ACADEMYOriginal approval 5/25/2017 (10 pages)1st Revision

Permit Reviews

Permit Number - DP17-0094
Permit Status: Complete
Permit Description: SITE/GRADING/SWPP - MATH & SCIENCE ACADEMYOriginal approval 5/25/2017 (10 pages)1st Revision
Start Date Submittal Complete Date Status  
02/12/2018 REVISION - - 3RD 02/13/2018 COMPLETED Review Details
04/19/2017 DEV PKG - OK TO SUBMIT 04/19/2017 COMPLETED Review Details
04/19/2017 DEV PKG 05/23/2017 COMPLETED Review Details
05/23/2017 DEV PKG - RESUBMITTAL 05/26/2017 COMPLETED Review Details
06/27/2017 DEV PKG - REVISION 11/22/2017 COMPLETED Review Details
08/15/2018 DEV PKG - REVISION 08/16/2018 ACTIVE Review Details
11/22/2017 REVISION - - 2ND 11/27/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0094
Permit Description: SITE/GRADING/SWPP - MATH & SCIENCE ACADEMYOriginal approval 5/25/2017 (10 pages)1st Revision
Total Completed Inspections - 9
Date Description Inspector Results Comments
06/12/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/12/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
09/12/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2018 SITE - Stormwater Follow-up Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/06/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) PLACE ADDITIONAL BMP'S AROUND THE STOCKPILE THAT IS LOCATED WEST OF THIS SITE.
2) CLEANUP ALL TRACKED OUT MATERIAL AS NEEDED ON THE PRIVATE PROPERTY WEST OF THIS SITE.} ; {Activity date: 08/07/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS SITE, NO RAIN HAS HAPPENED IN THE PAST WEEK AND THE SITE IS IN GOOD SHAPE. THIS SITE WILL NEED TO BE SCHEDULED IN 2 WEEKS OR EARLIER IF THEY HAVE OVER 1/2 IN OF RAIN BEFORE THEN.} ; {Activity date: 06/29/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER HDPE PIPING IN BASINS.}
09/12/2018 ENGR Grading Final Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2018 SITE - Stormwater Final Inspection Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/20/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NDO CONCERNS AT THIS TIME ALL CONTROLS APPEAR TO BE WORKING AS DESIGNED.} ; {Activity date: 06/12/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALL ALL SWPPP CONTOLS PER AP PLANS.}
09/12/2018 COT - ENGR - Signage Final Passed {Activity date: 09/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/13/2018 ENGR Engineering Final Passed {Activity date: 09/13/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/13/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }