Permit: DP17-0080
Permit Details
Apply Date:
04/05/2017
Applicant:
Lisa Bowers
Description:
GRADING/SITE - PARKING
Permit Reviews
Permit Number - DP17-0080
Permit Status: Complete
Permit Description: GRADING/SITE - PARKING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/05/2017 | DEV PKG - OK TO SUBMIT | 04/05/2017 | COMPLETED |
| 04/05/2017 | SITE and/or GRADING | 05/31/2017 | COMPLETED |
| 05/31/2017 | RESUB - SITE and/or GRADING | 08/22/2017 | COMPLETED |
| 08/22/2017 | RESUB - SITE and/or GRADING | 09/11/2017 | COMPLETED |
| 09/11/2017 | RESUB - SITE and/or GRADING | 12/07/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0080
Permit Description: GRADING/SITE - PARKING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/07/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/22/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - WALKED SITE WITH GC WENT OVER AP PLANS.} ; {Activity date: 03/13/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 06/12/2018 | ENGR Grading Final | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/12/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 06/12/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 06/20/2018 | ENGR Engineering Final | Passed | {Activity date: 06/20/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/18/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NEEDS TO BE CLEANED UP PRIOR TO CALLING IN FOR THIS FINAL INSPECTION.} ; {Activity date: 06/12/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS OK FOR THE TCO WITH THE FOLLOWING ISSUES TO BE ADDRESSED. 1) THE NORTHERN ADA PARKING SPACES ON THE WEST SIDE OF THE BUILDING EXCEEDS THE MAXIMUM SLOPE VALUE IN THE LAST 2 FEET OF THE SPACE. THE CONTRACTOR HAS BEEN ADVISED TO MAKE IT COMPLIANT BEFORE REQUESTING A FINAL INSPECTION FOR THIS SITE.} |